Indian Institutions and Fermilab Collaboration Meeting

US/Central
Description
Overall Planning and Goals The discussions on Oct 27th and 28th will be focused on technical overview, questions, resources etc. Oct 29th and 30th will be devoted to detailed technical planning, integrated schedule, milestones, needed reviews, agreement on detailed deliverables and a schedule of future face to face interaction. In general we need to: • Establish good one on one contact. Make sure there is time to sit and discuss the project and the functional requirements. • Agree on how communications (at the one on one level) will occur. • Understand the capabilities as well as any constraints of the groups involved. • Make sure that we understand - for each specific project/deliverable, what the risks and technical challenges are and where one can look for examples of similar work done by other projects. • Discuss the criteria under which any new designs would be evaluated. This might vary a little depending upon the specific deliverable. • Talk about the schedule and what needs to happen by when. If the schedule is not correct, suggest changes. • Develop a list of questions that need to be answered in order to make progress on each deliverable. • If there is some study or analysis that can be done now (while we prepare the Functional Requirement Specification) we could agree to start this work immediately. In the end, our Indian colleagues need to feel connected into this work and Fermilab, and ready to take ownership for the success of the Indian deliverables for which they are responsible. This work should also advance the Indian HIPA project.
    • 09:00 12:00
      Fermilab Management to meet with University of Delhi Management
    • 12:00 13:00
      Lunch 1h
    • 13:00 16:00
      Visit Inter-University Accelerator Center, New Delhi
      • 13:00
        Status of SSR1 Fabrication and plans for Supplement-1 Deliverables 1h
        Speaker: P. N. Prakash
        Slides
      • 14:00
        Proposal for SSR1 during the HIPA construction (2015-2020) 1h
        Speaker: A. Roy
      • 15:00
        Visit of cavity fabrication facility 1h
    • 16:00 19:00
      Depart for Indore in the evening of Oct 25th 3h
    • 10:00 13:00
      Joint meeting of Fermilab Management, DAE Apex Committee for IIFC and IC-IIFC
      • 10:00
        DAE Perspectives on IIFC: Opening Remarks 30m
        Speaker: S. Banerjee
        Slides
      • 10:30
        Status of Fermilab Project-X 30m
        Speaker: S. Holmes
        Slides
      • 11:00
        Indian Energy Program and IIFC 30m
        Speaker: A. Kakodkar
      • 11:30
        Overview of the IIFC Collaboration Program: Present and Future 30m
        Speaker: S. Mishra
        Slides
      • 12:00
        Indian HIPA Program and Related R&D 30m
        Speaker: P. Singh
        Slides
      • 12:30
        Indian Interest in Project-X Physics 30m
        Speaker: B. Choudhary
        Slides
    • 13:00 14:30
      Lunch 1h 30m
    • 14:30 16:30
      Reports from collaborating Indian Laboratories on Progress on Supplement 1, Plans and Prospects for next phase
      • 14:30
        Report on IIFC activities from BARC 30m
        Speaker: S. Kailas
      • 15:00
        Report on IIFC activities from IUAC 30m
        Speaker: D. Kanjilal
        Slides
      • 15:30
        Report on IIFC activities from RRCAT 30m
        Speaker: P.D. Gupta
        Slides
      • 16:00
        Report on IIFC activities from VECC 30m
        Speaker: R. Bhandari
        Slides
    • 16:30 17:00
      Tea Break 30m
    • 17:00 18:30
      Interaction and discussion on next phase of programs by IIFC Management

      (Drs. Holmes, Mishra, Kephart, Henderson, Banerjee, Kakodkar, Sinha, Gupta, Bhandari, Kailas, Roy, Sahni, Singh)

    • 17:00 18:30
      Interaction of IIFC Technical Managers
      slides
    • 09:00 10:00
      IIFC Technical Meeting with Fermilab Sub-Project Managers (Point of Contact) and Indian Sub-Project Managers (Point of Contact)
      • 09:00
        Project-X Open Questions and Technical Status 30m
        Speaker: J. Kerby
        Slides
      • 09:30
        Engineering Process for Project-X 30m
        Speaker: R. Stanek
        Slides
    • 10:00 10:30
      Tea Break 30m
    • 10:30 18:30
      Group A
      • 10:30
        650 MHz Cavity RD&D at RRCAT 1h
        Speaker: A. Puntambaker
        Slides
      • 11:30
        650 MHz Cavity RD&D at VECC 30m
        Speaker: S. Som
        Slides
      • 12:00
        650 MHz Cryomodule Design 1h
        Speaker: P. Khare
        Slides
      • 13:00
        Lunch 1h 30m
      • 14:30
        Tour of the SRF Infrastructure, RF Lab, Indus Complex, Laser Lab 2h 30m
      • 17:00
        Tea break 30m
      • 17:30
        SSR1 Cavity stats and thoughts on He Vessel 30m
        Speaker: P. N. Prakash
        Slides
      • 18:00
        650 MHz Cavity Blade Tuner Design 15m
        Speaker: H. Carter
        Slides
      • 18:15
        650 MHz Cavity Helium Vessel Design 15m
        Speaker: T. Peterson
        Slides
    • 10:30 18:30
      Group B
      • 10:30
        325 MHz RF Power development at BARC for IIFC 1h
        Speaker: V. K. Handu
        Slides
      • 11:30
        650 MHz RF Power development at RRCAT for IIFC 30m
        Speaker: P.R. Hanurkar
        Slides
      • 12:00
        Instrumentation and Controls development at BARC for IIFC 1h
        Speaker: C. K. Pithwa
        Slides
      • 13:00
        Lunch 1h 30m
      • 14:30
        Tour of the SRF Infrastructure, RF Lab, Indus Complex, Laser Lab 2h 30m
      • 17:00
        Tea Break 30m
      • 17:30
        BARC CW Power Coupler for 325 MHz for IIFC 30m
        Speaker: R. Kumar
        Slides
    • 09:00 10:30
      IIFC Technical Meeting with Fermilab Sub-Project Managers (Point of Contact) and Indian Sub-Project Managers (Point of Contact)
      • 09:00
        Design and Fabrication of CMTS 1h
        Will need cryomodule, cryogenics, RF, Instrumentation and Controls experts
        Speaker: A. K. Sinha and A. Klebaner
        Slides
      • 10:00
        Design and Fabrication of HTS 30m
        (Will need cryomodule, cryogenics, RF, Instrumentation and Controls experts)
        Speaker: P. Kush
        Slides
    • 10:30 11:00
      Tea Break 30m
    • 11:00 16:00
      Group A
      • 11:00
        Development of SRF Infrastructure at RRCAT 45m
        Speaker: S. Joshi
        Slides
      • 11:45
        650 MHz Cavity R&D at RRCAT 45m
        Speaker: A. Puntambaker
        Slides
      • 12:30
        Lunch 1h 30m
      • 14:00
        650 MHz Cryomodule Design 1h
        Speaker: P. Khare
      • 15:00
        Preparation of Group A Summary 1h
        Speaker: J. Kerby
    • 11:00 16:00
      Group B
      • 11:00
        RF Power for VTS and HTS 30m
        Speaker: P. Shrivastava
        Slides
      • 11:30
        325 MHz RF Power development at BARC for IIFC 30m
        Speaker: V. K. Handu
      • 12:00
        Instrumentation and Controls development at BARC for IIFC 30m
        Speaker: C. K. Pithwa
        Slides
      • 12:30
        Lunch 1h 30m
      • 14:00
        Further discussion as needed 1h
      • 15:00
        Preparation of Group B Summary 1h
        Speaker: R. Stanek et al
    • 16:00 16:30
      Tea Break 30m
    • 16:30 17:00
      Group A Summary 30m
      Slides
    • 17:00 17:30
      Group B Summary 30m
      Slides
    • 17:30 18:30
      Discussion on next phase of collaboration program 1h
      Speaker: Round Table Discussion
    • 09:00 18:00
      Oct 29-30 at RRCAT: (Jim Kerby will lead the Fermilab Group, Harry Carter, Tom Peterson and Camille Ginsburg) (Minimum expected lead people from Indian Institutions: Avinash, Prashant, Pradeep, Satish, Jayanta, Som, Prakash. They should invite others to the discussion)

      These two days will be devoted to the detailed Design, Engineering, Resource, and Scheduled discussions of Cavity and Cryomodule and SRF Infrastructure program under the collaboration. The emphasis will be on the Supplement 1 deliverables. This will be held at RRCAT Oct 29th -30th. We would like all the Indian colleagues involved in this aspects of collaboration to remain or join the meeting at RRCAT. Four lead scientists and engineering staff with focus in these areas will remain at RRCAT for these one on one discussion. The discussion will focus on Supplement 1 deliverable and interest areas of Indian laboratories and industrial strength that can contribute towards future programs.

    • 09:00 16:00
      Oct 29th at BARC (Fermilab: Holmes, Henderson, Kephart, Mishra)
      • 09:00
        Management Meeting between Fermilab Directors, BARC Director and Division Directors 5h
      • 14:00
        Tour of the BARC facility for the visiting Fermilab team 2h
    • 09:00 18:00
      Oct 29-30 at BARC: (Rich Stanek will lead the Fermilab Group, Manfred Wendt, Arkadiy Klebaner and Mark Champion) (Minimum expected lead people from Indian Institutions: V. K. Handu, P. R. Hannurkar, Purushottam Srivasrava, Manjiri Pande, C. K. Pithawa, Anant Krishanan, Gopal Joshi, Manjit Singh, R. L. Suthar, A. K. Sinha, Trilok Singh. They should invite others to the discussion)

      These two days will be devoted to the detailed Design, Engineering, Resource, and Scheduled discussions of Cryomodule Test Stand, Cryogenics, RF Power, RF Coupler, Instrumentation and Controls program under the collaboration. The emphasis will be on development of the addendum MOU V for the non-SRF program and deliverables. This will be held at BARC Oct 29th -30th. We would like all the Indian colleagues involved in this aspects of collaboration to join the meeting at BARC. Four lead scientists and engineering staff with focus in these areas will be at BARC for these one on one discussion. The discussion will focus on Supplement 1 deliverable, development of future collaboration including interest areas of Indian laboratories and industrial strength that can contribute towards future programs.

    • 09:00 16:00
      Oct 30th at VECC (Fermilab: Holmes, Henderson, Kephart, Mishra)
      • 09:00
        Management Meeting between Fermilab Directors, VECC Director and Division Directors 5h
      • 14:00
        Tour of the VECC facility for the visiting Fermilab team 2h
    • 09:00 12:30
      Summary talk given at Fermilab
      • 09:00
        Overall Summary 20m
        Speaker: S. Mishra
        Slides
      • 09:20
        Group A Summary 20m
        Speaker: J. Kerby
        Slides
      • 09:40
        Group B Summary 20m
        Speaker: R. Stanek
        Slides
      • 10:00
        SSR1 20m
        Speaker: H. Carter & T. Peterson
        Slides
      • 10:20
        650 MHz Cavity 20m
        Speaker: C. Ginsburg
        Slides
      • 10:40
        650 MHz Cryomodule 20m
        Speaker: T. Peterson
        Slides
      • 11:00
        CMTS 20m
        Speaker: A. Klebaner
        Slides
      • 11:20
        RF System 20m
        Speaker: M. Champion
        Slides
      • 11:40
        Instrumentation and Controls 20m
        Speaker: M. Wendt
        Slides