The indico website will be unavailable from Friday July 20, 5:00pm till Saturday July 21, 5:00pm due to scheduled power outage in the Feynman Computing Building
Parent category

TF1: Near Detector Optimisation

Managers

  • Brice, S.
  • Cherdack, D.
  • Mahn, K.
The near detector optimization task force is charged to: • develop GEANT4 simulations of the reference design near detector and possible alternatives; • perform a full end-to-end simulation connecting the measurements in the near detector to the far detector systematics using, for example, the VALOR framework; • evaluate the potential benefits of augmenting the reference design with o a LAr-TPC o the use of a High Pressure Gaseous TPC; • produce a first report on their findings to the DUNE Technical Board by September 2016 and a final report by March 2017.
There are 5 events in the past. Show them. fetching past events...