Mon-Thurs Accelerator Scheduling Meeting
9 AM Meeting (17 May 2017)

Crew Chief Operations Summary

  • See slide.
Linac
  • Recovered OK. Some issues, resolved.
Booster
  • Recovered from power outage BRF#17 still removed from circuit for buss bar work install. Would like 1 hr. opportunistic DT for BRF#10. Need ~ 1+ hr. for BRF#17 also.
Booster Neutrino
  • Rad monitor issues.
BNB Experiments
  • PMT issue, noisy. Some cryo issues. ANNIE primary user.
Main Injector & Recycler
  • Discussion about MI-52 vac issue. Argon found on RGA scan. Small leak on LAMB. Ion pump replaced. Disruptive studies held off for now.
NuMI
  • Target RAW flow adjusted. Access to turn on dehumidifier. (Two units one is broken. Broken one was the one thought to be on. Situation resolved.)
NuMI Experiments
  • Running well. Magnet came up by itself. (from reset)
Muon Rings
  • Ran 8 Gev beam yesterday through everything. Things good at this time. Ready to take locks off 907. M5 line PS check out. S&S MC1 Hall tomorrow. (?) Then start commisioning M5 line. Today take 3 Gev beam around.
SY120
  • Recovered well from power outage. Thanks to MSD & ops.
SY120 Experiments
  • Experiments doing fine except Seaquest, wire chamber re-install.
ES&H
  • The alarm last night @ MI-12 was not the same as several years ago.
EE Support
  • Q847 Klixon repair/relocation. R:LAM52 investigation continues. May need to replace. (est. 2 hrs.)
Mechanical
  • Debuncher water leak reported. System on standby pump while work in progress. MC7 leaking LCW pump to be replaced.
RF
  • Buss bar installation to be complete today or tomorrow. #17 ~ 1 hr. DT. #10 1 hr. DT.
MTA
  • Cavity testing continues.
Controls
  • Much effort with power outage recovery. Lost a couple of disk drives. BNB 204 chassis replaced. MI-10. Event $1F issue.
Instrumentation
  • Nothing to report.
FESS
  • Presention absent. (spot cooler @ MI-10) Thanks from Comm Ed for power outage & repair time.
Miscellaneous
  • FAST enclosure now ODH-1
There are minutes attached to this event. Show them.
    • 09:00 09:01
      Crew Chief Operations Summary 1m
      Slides
      See slide.
    • 09:01 09:02
      Linac 1m
      Recovered OK. Some issues, resolved.
    • 09:02 09:03
      Booster 1m
      Recovered from power outage BRF#17 still removed from circuit for buss bar work install. Would like 1 hr. opportunistic DT for BRF#10.  Need ~ 1+ hr. for BRF#17 also.
    • 09:03 09:04
      Booster Neutrino 1m
      Rad monitor issues.
    • 09:04 09:13
      BNB Experiments 9m
      PMT issue, noisy. Some cryo issues. ANNIE primary user.
    • 09:13 09:18
      Main Injector & Recycler 5m
      Discussion about MI-52 vac issue.   Argon found on RGA scan.   Small leak on LAMB.  Ion pump replaced.  Disruptive studies held off for now.
    • 09:18 09:19
      NuMI 1m
      Target RAW flow adjusted.  Access to turn on dehumidifier.  (Two units one is broken. Broken one was the one thought to be on.  Situation resolved.)
    • 09:19 09:20
      NuMI Experiments 1m
      Running well.  Magnet came up by itself.  (from reset)
    • 09:20 09:21
      Muon Rings 1m
      Ran 8 Gev beam yesterday through everything.  Things good at this time.  Ready to take locks off 907.  M5 line PS check out.  S&S MC1 Hall tomorrow. (?)  Then start commisioning M5 line.  Today take 3 Gev beam around.
    • 09:21 09:22
      SY120 1m
      Recovered well from power outage. Thanks to MSD & ops.
    • 09:22 09:23
      SY120 Experiments 1m
      Experiments doing fine except Seaquest, wire chamber re-install.
    • 09:24 09:25
      ES&H 1m
      The alarm last night @ MI-12 was not the same as several years ago.
    • 09:26 09:27
      EE Support 1m
      Q847 Klixon repair/relocation.  R:LAM52 investigation continues.  May need to replace. (est. 2 hrs.)
    • 09:27 09:28
      Mechanical 1m
      Debuncher water leak reported.  System on standby pump while work in progress.  MC7 leaking LCW pump to be replaced.
    • 09:28 09:29
      Fluids 1m
    • 09:29 09:30
      RF 1m
      Buss bar installation to be complete today or tomorrow.  #17 ~ 1 hr. DT.  #10 1 hr. DT.  
    • 09:30 09:31
      MTA 1m
      Cavity testing continues.
    • 09:31 09:32
      Controls 1m
      Much effort with power outage recovery.  Lost a couple of disk drives.  BNB 204  chassis replaced. MI-10.  Event $1F issue.
    • 09:32 09:33
      Instrumentation 1m
      Nothing to report.
    • 09:33 09:34
      FESS 1m
      Presention absent.  (spot cooler @ MI-10)  Thanks from Comm Ed for power outage & repair time.
    • 09:35 09:36
      Miscellaneous 1m
      FAST enclosure now ODH-1