AD Weekly Friday - 2017 Scheduling Meeting/Weekly Summary

US/Central
One West (Wilson Hall)

One West

Wilson Hall

Description
Weekly Scheduling, Planning and Status 
Performance Plots
Meetings will be held on Monday, Wednesday, and Friday of each week.
AD Weekly Friday - 2017 Scheduling Meeting/Weekly Summary (26 May 2017)

Crew Chief

  • See slide.
Operations Coordinator
  • See Plots.
Linac
  • Laser Notcher installed. Switch from source 'B' to 'A'. Marx #5 replaced with old vacuum tube mod.
  • Debuncher water skid issue this morning. Tuning on the new source in progress. Output on source 'A' is higher.
Booster
  • See slide. Tuning necessary with higher Linac output.
Main Injector & Recycler
  • See slides. RGA analysis pending.
NuMI
  • Balanced water flow on horn #1 RAW system. Found water leak on chilled water system, will fix during shutdown. V118 issue. Now ok.
NuMI Experiments
  • Running well.
Booster Neutrino
  • Back up & running stabily.
BNB Experiments
  • ANNIE running well, MicroBooNE back up. MB cryo system stablized but some concerns on purity. Found source of (false) PMT triggering.
Muon Rings
  • See slides. No plan to run over the holiday weekend.
Muon Experiments
  • Continued work on the inflector power supply.
MTA
  • No report.
SY120, Neutrino Muon, Meson Test, Meson Center
  • Inspection work in prep for summer shutdown. MSD changed oil on numerous vacuum stations. Fixed M02 vacuum station.
SY120 Experiments
  • Seaquest doing well;Lariet may take beam later. Current experiments running through the weekend. New experiment on Tuesday in Mtest.
FAST
  • Booster pump for ... skid was installed this week. 300 Mev line Beryllium window installed. Last of vacuum connections this morning. Complete beamline. Next week optics install & field polarity checks.
PIP-II Injector Test
  • No report.
Alignment
  • Work with ... & FAST. Work with AP0.
Controls
  • Nothing to add.
Cryo
  • Flushing systems with ridlime. North & South compressors both operational. Some issue with water valve requlation on North, set in manual mode. Start cooldown of cryo plant on Tuesday. Started HAB compressor. MTA running well.
ESH&Q
  • Nothing to report.
EE Support
  • MI30 work.
Instrumentation
  • IPM6N crate investigation.
Mechanical & Fluids
  • Assisted Lasr Notcher install, BRF7 tuner, debuncher skid pump. MI52 vacuum investigation. Nothing yet from RGA scan. MI40 pump skid pump #2 in manual. MI65 pressure regulator. Beamline LCW work. Vacuum pump oil change. Muon D60Q leak yet to be fixed. Regenerating MI col #1.
RF
  • BRF7 tuner replaced, BRF21 cable phasing & water. PM on RF stations.
FESS
  • Minos sump pump investigation.
Summer Shutdown 2017
  • See slides. Shutdown start moved to July 10th end -> Oct 23rd.
Miscellaneous
  • Laser notcher study today. "Totally transparent"
There are minutes attached to this event. Show them.
    • 09:00 09:03
      Crew Chief 3m One West

      One West

      Wilson Hall

      Slides
      See slide.
    • 09:03 09:06
      Operations Coordinator 3m One West

      One West

      Wilson Hall

      Plots
      See Plots.
    • 09:06 09:09
      Linac 3m One West

      One West

      Wilson Hall

      Laser Notcher installed. Switch from source 'B' to 'A'.   Marx #5 replaced with old vacuum tube mod.
      Debuncher water skid issue this morning. Tuning on the new source in progress.  Output on source 'A' is higher.
    • 09:09 09:12
      Booster 3m One West

      One West

      Wilson Hall

      Slides
      See slide.  Tuning necessary with higher Linac output.
    • 09:12 09:15
      Main Injector & Recycler 3m One West

      One West

      Wilson Hall

      Slides
      See slides.  RGA analysis pending.
    • 09:15 09:18
      NuMI 3m One West

      One West

      Wilson Hall

      Balanced water flow on horn #1 RAW system.  Found water leak on chilled water system, will fix during shutdown.  V118 issue.  Now ok.
    • 09:18 09:21
      NuMI Experiments 3m One West

      One West

      Wilson Hall

      Running well.
    • 09:21 09:23
      Booster Neutrino 2m One West

      One West

      Wilson Hall

      Back up & running stabily.
    • 09:23 09:24
      BNB Experiments 1m One West

      One West

      Wilson Hall

      ANNIE running well, MicroBooNE back up.  MB cryo system stablized but some concerns on purity.  Found source of (false) PMT triggering.
    • 09:24 09:26
      Muon Rings 2m One West

      One West

      Wilson Hall

      Slides
      See slides.  No plan to run over the holiday weekend.
    • 09:27 09:28
      Muon Experiments 1m One West

      One West

      Wilson Hall

      Speakers: Brendan Casey (FNAL), Brendan Kiburg (Fermilab), Joe Grange (Argonne National Lab)
      Continued work on the inflector power supply.
    • 09:28 09:30
      MTA 2m One West

      One West

      Wilson Hall

      No report.
    • 09:30 09:32
      SY120, Neutrino Muon, Meson Test, Meson Center 2m One West

      One West

      Wilson Hall

      Inspection work in prep for summer shutdown. MSD changed oil on numerous vacuum stations. Fixed M02 vacuum station.
    • 09:32 09:35
      SY120 Experiments 3m One West

      One West

      Wilson Hall

      Seaquest doing well;Lariet may take beam later.  Current experiments running through the weekend. New experiment on Tuesday in Mtest.
    • 09:35 09:38
      FAST 3m One West

      One West

      Wilson Hall

      Booster pump for ... skid was installed this week.  300 Mev line Beryllium window installed.  Last of vacuum connections this morning.  Complete beamline. Next week optics install & field polarity checks.
    • 09:38 09:40
      PIP-II Injector Test 2m One West

      One West

      Wilson Hall

      No report.
    • 09:40 09:42
      Alignment 2m One West

      One West

      Wilson Hall

      Work with ... & FAST.  Work with AP0.
    • 09:42 09:45
      Controls 3m One West

      One West

      Wilson Hall

      Nothing to add.
    • 09:45 09:47
      Cryo 2m One West

      One West

      Wilson Hall

      Flushing systems with ridlime. North & South compressors both operational.  Some issue with water valve requlation on North, set in manual mode. Start cooldown of cryo plant on Tuesday.  Started HAB compressor. MTA running well.
    • 09:47 09:50
      ESH&Q 3m One West

      One West

      Wilson Hall

      Nothing to report.
    • 09:50 09:52
      EE Support 2m One West

      One West

      Wilson Hall

      MI30 work.
    • 09:52 09:54
      Instrumentation 2m One West

      One West

      Wilson Hall

      IPM6N crate investigation.
    • 09:54 09:55
      Mechanical & Fluids 1m One West

      One West

      Wilson Hall

      Assisted Lasr Notcher install, BRF7 tuner, debuncher skid pump.   MI52 vacuum investigation. Nothing yet from RGA scan.  MI40 pump skid pump #2 in manual. MI65 pressure regulator.  Beamline LCW work. Vacuum pump oil change.  Muon D60Q leak yet to be fixed. Regenerating MI col #1.
    • 09:55 09:56
      RF 1m One West

      One West

      Wilson Hall

      BRF7 tuner replaced, BRF21 cable phasing & water. PM on RF stations.
    • 09:56 09:58
      FESS 2m One West

      One West

      Wilson Hall

      Speakers: Gilbert, Shirley, Sprosty
      Minos sump pump investigation. 
    • 09:58 09:59
      Summer Shutdown 2017 1m One West

      One West

      Wilson Hall

      Speaker: Mr Cons Gattuso (Fermi Lab)
      Slides
      See slides.  Shutdown start moved to July 10th  end -> Oct 23rd.
    • 09:59 10:00
      Miscellaneous 1m One West

      One West

      Wilson Hall

      Laser notcher study today. "Totally transparent"