Mon-Thurs Accelerator Scheduling Meeting
    • 09:00 09:01
      Crew Chief Operations Summary 1m
      Slides
    • 09:01 09:02
      Linac 1m
      Ran well over the weekend.
    • 09:02 09:03
      Booster 1m
      Tuning for intensity over the weekend.
      Friday afternoon BRF11 tripped the yard breaker.
      Laser notcher studies were done Friday afternoon.
    • 09:03 09:04
      Booster Neutrino 1m
      Dehumidifier holding tank at MI12 needs attention and will be dealt with today.
    • 09:04 09:13
      BNB Experiments 9m
      Running well.
    • 09:13 09:18
      Main Injector & Recycler 5m
      Good weekend.
      Plan to address MI52 vacuum issues tomorrow.
    • 09:18 09:19
      NuMI 1m
      Ran well over the weekend.
    • 09:19 09:20
      NuMI Experiments 1m
      Running well.
      Sump pump issues are still being addressed by FESS.
    • 09:20 09:21
      Muon Rings 1m
      Beam to MC1 over the weekend.  Proton dump istallation is taking place today.
    • 09:21 09:22
      Muon Experiments 1m
    • 09:22 09:23
      SY120 1m
      Key tree interlock solenoid was replaced by interlock techs.
    • 09:23 09:24
      SY120 Experiments 1m
      MTEST experiments are running well.
      SeaQuest is doing OK.
      LAriat is working on some electronics problems.
    • 09:25 09:26
      ES&H 1m
      HV100 has been locked off for Muon campus access.
    • 09:26 09:27
      EE Support 1m
      LAM60 PS tripped off during the power glitch on Saturday. Techs came in and reset it.
    • 09:27 09:28
      Mechanical 1m
    • 09:28 09:29
      Fluids 1m
      Would like to regenerate column 3 today.
    • 09:29 09:30
      RF 1m
      Quiet weekend.
    • 09:30 09:31
      MTA 1m
    • 09:31 09:32
      Controls 1m
    • 09:32 09:33
      Instrumentation 1m
    • 09:33 09:34
      FESS 1m
      Replaced both check valves in the NuMi sump pumps but no improvement was seen.
      Sump pump #2 is being pulled today for inspection and repair if possible. A spare is available if necessary.

        Friday there were problems with the sump in CUB which were ultimately traced to "Minos muck" infiltrating the system. The Minos water has been diverted elsewhere.

        Beginning annual valve excersise today.

        There is a request to run the HAB chiller, however the heat load is insufficient. Options for dehumidification are being discussed.
    • 09:35 09:36
      Miscellaneous 1m
      THere will be a shutdown Tuesday 6/6 beginning at 0600 for MI vacuum work at MI52. The expected return of beam is Wednesday afternoon but this could extend to Thursday depending on wha tis found with the vacuum system.

      Check the worklist for permitted activities.