9 AM Meeting

US/Central
Huddle

Huddle

Description
Mon-Thurs Accelerator Scheduling Meeting
9 AM Meeting (07 Jun 2017)

Linac

  • KRF5 driver PS was replaced yesterday afternoon. Smooth running otherwise.
Booster
  • Working on modifications to the cogging module code to accommodate Laser Notcher operation. Another brief interruption in beam will occur this morning as the code is tested again.
Booster Neutrino
  • Running well.
BNB Experiments
  • Running well.
Main Injector & Recycler
  • Running well. Efficiencies are at ~95%. Averaging about 650KW.
  • LCW supply temperature regulation is nearing the limit as warmer weather occurs. This may necessitate a reduction in duty cycle at some point.
NuMI
  • Turned off the vinegar injection yesterday to attempt to mitigate the muck problem.
NuMI Experiments
  • Experiments are running well.
  • The plan to pull one of the sump pumps on Monday had to be delayed due to elevator problems. This work has resumed today.
Muon Rings
  • Installation of the new dipole is proceeding.
  • The installation of the dump module is encountering some sort of clearance issue that is currently being investigated.
Muon Experiments
  • Offline analysis has confirmed storage of muons and protons in the ring.
SY120
  • SeaQuest is off today until 5PM.
  • Running well otherwise.
SY120 Experiments
  • LAriat will be ready for beam tomorrow.
  • Mtest studies are going well. Next changeover is next week.
RF
  • Running well.
FESS
  • Pulling a Minos sump pump today.
  • Investigating the possibility of installing a skid at the sump to clean out the muck. Also plan to chlorinate the sump pit.
  • Inspecting the softeners at CUB today.
Power pole inspection in the village is in progress.MI62 sprayer problem repairs are in the planning stage.Miscellaneous
  • MI would like to do a study of injection timing modifications in preparation for G-2 operation. This will interrupt beam to users (except BNB) for a few hours.
  • Currently plan to start this at 1300 hours today.
There are minutes attached to this event. Show them.
    • 09:00 09:01
      Crew Chief Operations Summary 1m
      Slides
    • 09:01 09:02
      Linac 1m
      KRF5 driver PS was replaced yesterday afternoon. Smooth running otherwise.
    • 09:02 09:03
      Booster 1m
      Working on modifications to the cogging module code to accommodate Laser Notcher operation. Another brief interruption in beam will occur this morning as the code is tested again.
    • 09:03 09:04
      Booster Neutrino 1m
      Running well.
    • 09:04 09:13
      BNB Experiments 9m
      Running well.
    • 09:13 09:18
      Main Injector & Recycler 5m
      Running well.  Efficiencies are at ~95%. Averaging about 650KW.
      LCW supply temperature regulation is nearing the limit as warmer weather occurs. This may necessitate a reduction in duty cycle at some point.
    • 09:18 09:19
      NuMI 1m
      Turned off the vinegar injection yesterday to attempt to mitigate the muck problem.
    • 09:19 09:20
      NuMI Experiments 1m
      Experiments are running well.
      The plan to pull one of the sump pumps on Monday had to be delayed due to elevator problems. This work has resumed today.
    • 09:20 09:21
      Muon Rings 1m
      Installation of the new dipole is proceeding.
      The installation of the dump module is encountering some sort of clearance issue that is currently being investigated.
    • 09:21 09:22
      Muon Experiments 1m
      Offline analysis has confirmed storage of muons and protons in the ring.
    • 09:22 09:23
      SY120 1m
      SeaQuest is off today until 5PM.
      Running well otherwise.
    • 09:23 09:24
      SY120 Experiments 1m
      LAriat will be ready for beam tomorrow.
      Mtest studies are going well.  Next changeover is next week.
    • 09:25 09:26
      ES&H 1m
    • 09:26 09:27
      EE Support 1m
    • 09:27 09:28
      Mechanical 1m
    • 09:28 09:29
      Fluids 1m
    • 09:29 09:30
      RF 1m
      Running well.
    • 09:30 09:31
      MTA 1m
    • 09:31 09:32
      Controls 1m
    • 09:32 09:33
      Instrumentation 1m
    • 09:33 09:34
      FESS 1m
      Pulling a Minos sump pump today.
      Investigating the possibility of installing a skid at the sump to clean out the muck. Also plan to chlorinate the sump pit.
      Inspecting the softeners at CUB today.

      Power pole inspection in the village is in progress.

      MI62 sprayer problem repairs are in the planning stage.
    • 09:35 09:36
      Miscellaneous 1m
      MI would like to do a study of injection timing modifications in preparation for G-2 operation. This will interrupt beam to users (except BNB) for a few hours.
      Currently plan to start this at 1300 hours today.