AD Weekly Friday - 2017 Scheduling Meeting/Weekly Summary (09 Jun 2017)

Linac

  • Ran pretty well this week.
Booster
  • 4.6E12/pulse to NuMi.
  • Working on injection losses.
  • 1E12/pulse to SY.
  • 1.8E17 protons/hour.
  • Did early capture studies, coupled bunch instability studies, laser notcher studies, cogging module software updates.
  • Looking at 2 days of Booster studies sometime around 7/6.
Main Injector & Recycler
  • Good week.
  • Major work was the injection timing change to accommodate Muon cycles.
  • MI52 vacuum has behaved itself. Plans are in place to address it if problems arise again.
  • Upcoming studies are for establishing a 1.2 second ramp.
NuMI
  • There have been no permit trips since EE Support added filtering to the DCCT signal.
  • Running well.
NuMI Experiments
  • Running well.
  • Have discontinued vinegar treatments to the sump water since that was exacerbating the biofouling problem.
Booster Neutrino
  • Running well.
BNB Experiments
  • Running well.
Muon Rings
  • Proton dump has been installed.
  • Replaced dipole V742.
  • Replaced "sticky" PWC.
  • Weekend plans are to take beam and work on efficiencies and delivery ring orbits.
Muon Experiments
  • G-2 is showing some good success. They will need two days of downtime next week.
SY120 Experiments
  • SeaQuest and MTEST are runnning well.
  • MTEST will have their final switchover before the shutdown next Wednesday.
  • LAriat has additional work to do before taking beam.
FAST
  • 300MeV line quads have all been valved in.
  • All BLMs have been installed.
  • LCW system has been brought up to nominal temp and pressure.
  • Warm conditioning of cryo cavities will start next week.
PIP-II Injector Test
  • ORC walkthrough is complete. Permission is in place to run beam with pulse width of 20uS at 10Hz.
  • Plan to start turn on of the LEBT tomorrow.
Cryo
  • CMTF plant is cold at 4K.
  • MTA is cold at 4K.
  • Meson cryo is off and piping modifications are nearly complete.
  • MC1, G2 plant is cold.
  • HAB plant is cold.
  • NML/FAST has been purified.
ESH&Q
  • Expressing thanks to all who assisted with the AP0 absorber installation.
Mechanical & Fluids
  • MI62 shows a water leak indication.
  • F4 building needs to be cleared of stored equipment to allow heat exchanger work to occur.
RF
  • Running well.
  • MIRF4 has a water leak that will need attention when time permits.
FESS
  • Progress is being made on the "MINOS muck" problem; Biofouling of the sump pumps and of equipment at CUB is being addressed by discontinuing vinegar treatment of MINOS sumps and doing treatments with chlorine bleach. After cleaning the muck from one sump pump, the pumping rate increased from ~30GPM back to the nominal value of ~370GPM.
Meson cryo strainer is being cleaned. CHL is going down in preparation for a feeder switch. Inspection of power poles on site is in progress.
There are minutes attached to this event. Show them.
    • 09:00 09:03
      Crew Chief 3m One West

      One West

      Wilson Hall

      Slides
    • 09:03 09:06
      Operations Coordinator 3m One West

      One West

      Wilson Hall

    • 09:06 09:09
      Linac 3m One West

      One West

      Wilson Hall

      Ran pretty well this week.
    • 09:09 09:12
      Booster 3m One West

      One West

      Wilson Hall

      Slides
      4.6E12/pulse to NuMi.
      Working on injection losses.
      1E12/pulse to SY.
      1.8E17 protons/hour.
      Did early capture studies, coupled bunch instability studies, laser notcher studies, cogging module software updates.
      Looking at 2 days of Booster studies sometime around 7/6.
    • 09:12 09:15
      Main Injector & Recycler 3m One West

      One West

      Wilson Hall

      Slides
      Good week.
      Major work was the injection timing change to accommodate Muon cycles.
      MI52 vacuum has behaved itself. Plans are in place to address it if problems arise again.
      Upcoming studies are for establishing a 1.2 second ramp.
    • 09:15 09:18
      NuMI 3m One West

      One West

      Wilson Hall

      There have been no permit trips since EE Support added filtering to the DCCT signal.
      Running well.
    • 09:18 09:21
      NuMI Experiments 3m One West

      One West

      Wilson Hall

      Running well.
      Have discontinued vinegar treatments to the sump water since that was exacerbating the biofouling problem.
    • 09:21 09:23
      Booster Neutrino 2m One West

      One West

      Wilson Hall

      Running well.
    • 09:23 09:24
      BNB Experiments 1m One West

      One West

      Wilson Hall

      Running well.
    • 09:24 09:26
      Muon Rings 2m One West

      One West

      Wilson Hall

      Slides
      Proton dump has been installed.
      Replaced dipole V742.
      Replaced "sticky" PWC.
      Weekend plans are to take beam and work on efficiencies and delivery ring orbits.
    • 09:27 09:28
      Muon Experiments 1m One West

      One West

      Wilson Hall

      Speakers: Brendan Casey (FNAL), Brendan Kiburg (Fermilab), Joe Grange (Argonne National Lab)
      G-2 is showing some good success. They will need two days of downtime next week.
    • 09:28 09:30
      MTA 2m One West

      One West

      Wilson Hall

    • 09:30 09:32
      SY120, Neutrino Muon, Meson Test, Meson Center 2m One West

      One West

      Wilson Hall

    • 09:32 09:35
      SY120 Experiments 3m One West

      One West

      Wilson Hall

      SeaQuest and MTEST are runnning well.
      MTEST will have their final switchover before the shutdown next Wednesday.
      LAriat has additional work to do before taking beam.
    • 09:35 09:38
      FAST 3m One West

      One West

      Wilson Hall

      300MeV line quads have all been valved in.
      All BLMs have been installed.
      LCW system has been brought up to nominal temp and pressure.
      Warm conditioning of cryo cavities will start next week.
    • 09:38 09:40
      PIP-II Injector Test 2m One West

      One West

      Wilson Hall

      ORC walkthrough is complete. Permission is in place to run beam with pulse width of 20uS at 10Hz.
      Plan to start turn on of the LEBT tomorrow.
    • 09:40 09:42
      Alignment 2m One West

      One West

      Wilson Hall

    • 09:42 09:45
      Controls 3m One West

      One West

      Wilson Hall

    • 09:45 09:47
      Cryo 2m One West

      One West

      Wilson Hall

      CMTF plant is cold at 4K.
      MTA is cold at 4K.
      Meson cryo is off and piping modifications are nearly complete.
      MC1, G2 plant is cold.
      HAB plant is cold.
      NML/FAST has been purified.
    • 09:47 09:50
      ESH&Q 3m One West

      One West

      Wilson Hall

      Expressing thanks to all who assisted with the AP0 absorber installation.
    • 09:50 09:52
      EE Support 2m One West

      One West

      Wilson Hall

    • 09:52 09:54
      Instrumentation 2m One West

      One West

      Wilson Hall

    • 09:54 09:55
      Mechanical & Fluids 1m One West

      One West

      Wilson Hall

      MI62 shows a water leak indication.
      F4 building needs to be cleared of stored equipment to allow heat exchanger work to occur.
    • 09:55 09:56
      RF 1m One West

      One West

      Wilson Hall

      Running well.
      MIRF4 has a water leak that will need attention when time permits.
    • 09:56 09:58
      FESS 2m One West

      One West

      Wilson Hall

      Speakers: Gilbert, Shirley, Sprosty
      Slides
      Progress is being made on the "MINOS muck" problem; Biofouling of the sump pumps and of equipment at CUB is being addressed by discontinuing vinegar treatment of MINOS sumps and doing treatments with chlorine bleach. After cleaning the muck from one sump pump, the pumping rate increased from ~30GPM back to the nominal value of ~370GPM.

        Meson cryo strainer is being cleaned.

        CHL is going down in preparation for a feeder switch.

        Inspection of power poles on site is in progress.
    • 09:58 09:59
      Summer Shutdown 2017 1m One West

      One West

      Wilson Hall

      Speaker: Mr Cons Gattuso (Fermi Lab)
    • 09:59 10:00
      Miscellaneous 1m One West

      One West

      Wilson Hall

      Slides