Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable for scheduled server patching on Wednesday, April 17; 7 a.m. to 7:30 a.m. Central Time .
30 August 2016 to 1 September 2016
Amway Grand Grand Rapids, MI
US/Eastern timezone
Workshop to discuss issues concerning the operation of projectile fragment separators such as the A1900 at the NSCL, BigRIPS at RIKEN, and the FRS at GSI and the design and construction of next-generation separators such as ARIS at FRIB and the SuperFRS at FAIR.