External Beams Department Operations Meeting 11/03/2016 Attend: Michael Gordon Rick Tom Phil Herman Carol Craig Tia Reports: Department (see slides) NuMI horn1 scans and alignment complete target scan tomorrow (11/04/2016) or early next week possible six batch running by end of next week BNB still need to commission rapid trim, will wait until flux is reduced SY beam to SYD on Friday (11/04/2016), possibly to E906 (see e-mail from Adam) ADOps (no report) Old Business: cable mitigation * (tabled) gas line mitigation * (tabled) M01 buss work * should be complete next week need for 30GeV e- beam * (tabled) New Business: Tia presentation (see slides) line drawings for air and Ar/CO_2 lines in Meson and Neutrino * (sent e-mail to Carol, Michael, Adam, and Gordon) single line electrical drawings for MS1 * (sent e-mail to Carol, Michael, Adam, and Gordon) Michael presentation * (tabled) AOB Phil passed Latin Rick, Carol, and Tom were dubious regarding E&M (*) indicates follow-up for next week.