External Beams Department Operations Meeting 11/10/2016 Attend: Michael Phil Tom Gordon Carol Reports: Department people should begin relocating -- do not know how much warning we will get NuMI low intensity target scan complete possible six batch running by end of this week BNB still need to commission rapid trim, will wait until flux is reduced SY beam to SYD and E906 MS1 buss work complete (~$100k) -- provides single LOTO point ADOps (no report) Old Business: cable mitigation * Adam is tracking down relay racks gas line mitigation * (tabled) need for 30GeV e- beam * (tabled) line drawings for air and Ar/CO_2 lines in Meson and Neutrino * (tabled) single line electrical drawings for MS1 * (tabled) New Business: Michael presentation (see slides) AOB (none) (*) indicates follow-up for next week.