External Beams Department Operations Meeting
11/10/2016
Attend:
Phil
Gordon
Carol
Wally
Adam
Reports:
Department
Discussion of where each person is relocating, either NTF offices or Booster West Portacamps
NuMI
Beam down due to MI-8 line vacuum burst, no ETA
BNB
Beam down due to MI-8 line vacuum burst, no ETA
SY
MI-52 electrostatic septum tank A position readback issues, suspect stuck LVDT, access today
ADOps
Nothing new to report
Old Business:
cable mitigation *
Adam is tracking down relay racks
gas line mitigation *
(tabled)
need for 30GeV e- beam *
(tabled)
line drawings for air and Ar/CO_2 lines in Meson and Neutrino *
(tabled)
single line electrical drawings for MS1 *
(tabled)
AOB
(none)
(*) indicates follow-up for next week.