Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method will be removed on Tuesday, Feb 4th at 5PM CST. See news for more details.

AD External Beams Weekly Planning Meeting

US/Central
Dungeon (Fermilab)

Dungeon

Fermilab

Participants
  • Carol Johnstone
  • Craig Moore
  • Gordon Koizumi
  • Herman White
  • Philip Schlabach
  • Rick Coleman
  • Sam Childress
  • Thomas R. Kobilarcik
  • Watts Adam
    • 09:00 09:10
      Overview 10m
    • 09:10 09:30
      Investigation Into the Use of Rare Earth Permanent Magnets as a Spectrometer at FTBF 20m
    • 09:30 09:50
      Feature 2 20m
      External Beams Department Operations Meeting
      11/10/2016
      
      Attend:
          Phil
          Gordon
          Carol
              Wally
              Adam
      
      Reports:
          Department
              Discussion of where each person is relocating, either NTF offices or Booster West Portacamps
          NuMI
              Beam down due to MI-8 line vacuum burst, no ETA
          BNB
              Beam down due to MI-8 line vacuum burst, no ETA
      
          SY
              MI-52 electrostatic septum tank A position readback issues, suspect stuck LVDT, access today
          ADOps
              Nothing new to report
      
      Old Business:
          cable mitigation *
              Adam is tracking down relay racks
          gas line mitigation *
              (tabled)
          need for 30GeV e- beam *
              (tabled)
          line drawings for air and Ar/CO_2 lines in Meson and Neutrino *
              (tabled)
          single line electrical drawings for MS1 *
              (tabled)
      
      AOB
          (none)
              
      (*) indicates follow-up for next week.