Construction Readiness Review for Mu2e Extinction Collimation System

US/Central
SkyBox (2S) (FAST (New Muon Lab))

SkyBox (2S)

FAST (New Muon Lab)

Description
This is a Construction Readiness Review (CRR) of the Extinction Collimation System of the Mu2e Experiment.
Charge
Final report (requires password)
Supporting Documentation (requires password)
    • 1
      Executive Session (closed)
    • 2
      Overview/Response to Recommendations
      Speaker: Dr Eric Prebys (Fermilab)
      Slides
    • 3
      Design/Procurement Plan
      Speaker: Mr Vladimir Sidorov (Fermilab)
      Slides
    • 10:20
      Coffee
    • 4
      Executive Session (closed)
    • 5
      Q&A
    • 6
      Writing Session (closed)
    • 7
      Closeout
      Final Report (requires password)