Tuesday March 28, 2017:
(Vladimir N., Matt Alvarez, Mike Pham, Christine Ader)
Mike
Finished most of the stuff on the list that he can
Fixturing and stand and fiducials #4 and #5 not designed yet
Hardware for the support bracket is implemented
Fixturing for installations: we know the part number for the MI52 fixture, we don’t know if there is a model or a drawing
Mike knows how the assembly of MI52 works
Installation time for the frame was about 1.5 hrs
CE is ¼” all the way – need to change back to 1/8” in the forward angled part (45deg)
Need to change the baffle lengths per the frame change.
Matt
Met with alignment about the frame
They want the nests on the Vessel for bubble level
They want nests on the frame for the laser crystal placement
CE spacer
Chris suggested using standard part
Matt want to stick to g-2 spacer design
Made a design with convolution and caps and did analysis
Lower cap occupies the gap completely
Now the field is compressed in a thin region close to the gap
Surface field reaches 55kV/cm
This design is not acceptable
Modifications discusses:
Thinner caps
A ring with conical inner surface
Indium foil; with pressed sitting for the ceramic
Bottom one needs to be thinner
top one is not needed at all
Convolution should be visible in the gap
The pocket may have opening angle – Matt says there is no space to do this
Discussed the CE FT
The metal electrodes do not touch the ceramic insulation in the back wall of the frame
If there is a chance to touch, the touch point should be in the middle rather than on the faces where the distance to the metal ground is minimal