Crew Chief Operations Summary

  • Shutdown day, accesses + power outage. (good weekend)
Linac
  • Good weekend. Water pumps cycled for confirmation. Filaments off until this evening. (after second power outage) Linac in stand by.
Booster
  • Well over the weekend. Friday BRF6 tripped utility yard breaker. Left BRF6 off. Lost BRF11 then turned on BRF6. Still a breaker issue with BRF. BRF17 pulled out due to buss bar work. BRF6 & 11 investigation today.
Booster Neutrino
  • Running well.
BNB Experiments
  • Running well. In standby until after 2nd power outage.
Main Injector & Recycler
  • Good weekend. 520 area vacuum investigation. My change an ion pump.
NuMI
  • Power glitch on Saturday evening.
NuMI Experiments
  • In standby mode until 2nd power outage. NOVA is up enough to check fire protection system.
Muon Rings
  • Successfully send beam to target and secondary beam down M2, M3 & into Delivery ring. Target rotation & motion control not working. PS testing in M5 line. May remove critical device locks tomorrow if ready. Shielding block installation. BV900 stuck. BBP tracking issue, suggested it is a toroid problem.
SY120
  • Nothing to report.
SY120 Experiments
  • Mtest running well, no new experiments his week. Lariet will take cosmics during the day. Seaquest installing hotoscopes. SQ has a broken wire in chamber. Will pull today.
ES&H
  • MI-12 now OK.
EE Support
  • R:LAM52 over temp investigation.
Mechanical
  • Techs working on access jobs.
Fluids
  • Nothing to report.
RF
  • Booster station #21 buss bar installation. BRF#17 off while installing buss bar. BRF#11 is a bias supply issue. Should come up with full complement of RF excepting BRf#17.
MTA
  • Nothing to report.
Controls
  • Recovering from power outage, ready to repeat this afternoon.
Instrumentation
  • Nothing to report.
FESS
  • No report.
Miscellaneous
  • Begin accelerator startup after second power outage and cooling recovery.
There are minutes attached to this event. Show them.
    • 1
      Crew Chief Operations Summary
      Slides
      Shutdown day, accesses + power outage.  (good weekend)
    • 2
      Linac
      Good weekend.   Water pumps cycled for confirmation.   Filaments off until this evening. (after secon power outage)  Linac in stand by.
    • 3
      Booster
      Well over the weekend.  Friday BRF6 tripped utility yard breaker.  Left BRF6 off.  Lost BRF11 then turned on BRF6.   Still a breaker issue with BRF.  BRF17 pulled out due to buss bar work. BRF6 & 11 investigation today.
    • 4
      Booster Neutrino
      Running well.
    • 5
      BNB Experiments
      Running well.  In standby until after 2nd power outage.
    • 6
      Main Injector & Recycler
      Good weekend.  520 area vacuum investigation. My change an ion pump.
    • 7
      NuMI
      Power glitch on Saturday evening.
    • 8
      NuMI Experiments
      In standby mode until 2nd power outage.  NOVA is up enough to check fire protection system.
    • 9
      Muon Rings
      Successfully send beam to target and secondary beam down M2, M3 & into Delivery ring.  Target rotation & motion control not working. PS testing in M5 line. May remove critical device locks tomorrow if ready. Shielding block installation. BV900 stuck.  BBP tracking issue, suggested it is a toroid problem.
    • 10
      SY120
      Nothing to report.
    • 11
      SY120 Experiments
      Mtest running well, no new experiments his week.  Lariet will take cosmics during the day.  Seaquest installing hotoscopes.  SQ has a broken wire in chamber.   Will pull today.
    • 12
      ES&H
      MI-12 now OK.
    • 13
      EE Support
      R:LAM52 over temp investigation.
    • 14
      Mechanical
      Techs working on access jobs.
    • 15
      Fluids
      Nothing to report.
    • 16
      RF
      Booster station #21 buss bar installation. BRF#17 off while installing buss bar.  BRF#11 is a bias supply issue.  Should come up with full complement of RF excepting BRf#17. 
    • 17
      MTA
      Nothing to report.
    • 18
      Controls
      Recovering from power outage, ready to repeat this afternoon.
    • 19
      Instrumentation
      Nothing to report.
    • 20
      FESS
      No report.
    • 21
      Miscellaneous
      Begin accelerator startup after second power outage and cooling recovery.