Recovered from power outage BRF#17 still removed from circuit for buss bar work install. Would like 1 hr. opportunistic DT for BRF#10. Need ~ 1+ hr. for BRF#17 also.
Booster Neutrino
Rad monitor issues.
BNB Experiments
PMT issue, noisy. Some cryo issues. ANNIE primary user.
Main Injector & Recycler
Discussion about MI-52 vac issue. Argon found on RGA scan. Small leak on LAMB. Ion pump replaced. Disruptive studies held off for now.
NuMI
Target RAW flow adjusted. Access to turn on dehumidifier. (Two units one is broken. Broken one was the one thought to be on. Situation resolved.)
NuMI Experiments
Running well. Magnet came up by itself. (from reset)
Muon Rings
Ran 8 Gev beam yesterday through everything. Things good at this time. Ready to take locks off 907. M5 line PS check out. S&S MC1 Hall tomorrow. (?) Then start commisioning M5 line. Today take 3 Gev beam around.
SY120
Recovered well from power outage. Thanks to MSD & ops.
SY120 Experiments
Experiments doing fine except Seaquest, wire chamber re-install.
ES&H
The alarm last night @ MI-12 was not the same as several years ago.
EE Support
Q847 Klixon repair/relocation. R:LAM52 investigation continues. May need to replace. (est. 2 hrs.)
Mechanical
Debuncher water leak reported. System on standby pump while work in progress. MC7 leaking LCW pump to be replaced.
RF
Buss bar installation to be complete today or tomorrow. #17 ~ 1 hr. DT. #10 1 hr. DT.
MTA
Cavity testing continues.
Controls
Much effort with power outage recovery. Lost a couple of disk drives. BNB 204 chassis replaced. MI-10. Event $1F issue.
Instrumentation
Nothing to report.
FESS
Presention absent. (spot cooler @ MI-10) Thanks from Comm Ed for power outage & repair time.
Miscellaneous
FAST enclosure now ODH-1
There are minutes attached to this event.
Show them.
1
Crew Chief Operations Summary
Slides
See slide.
2
Linac
Recovered OK. Some issues, resolved.
3
Booster
Recovered from power outage BRF#17 still removed from circuit for buss bar work install. Would like 1 hr. opportunistic DT for BRF#10. Need ~ 1+ hr. for BRF#17 also.
4
Booster Neutrino
Rad monitor issues.
5
BNB Experiments
PMT issue, noisy. Some cryo issues. ANNIE primary user.
6
Main Injector & Recycler
Discussion about MI-52 vac issue. Argon found on RGA scan. Small leak on LAMB. Ion pump replaced. Disruptive studies held off for now.
7
NuMI
Target RAW flow adjusted. Access to turn on dehumidifier. (Two units one is broken. Broken one was the one thought to be on. Situation resolved.)
8
NuMI Experiments
Running well. Magnet came up by itself. (from reset)
9
Muon Rings
Ran 8 Gev beam yesterday through everything. Things good at this time. Ready to take locks off 907. M5 line PS check out. S&S MC1 Hall tomorrow. (?) Then start commisioning M5 line. Today take 3 Gev beam around.
10
SY120
Recovered well from power outage. Thanks to MSD & ops.
11
SY120 Experiments
Experiments doing fine except Seaquest, wire chamber re-install.
12
ES&H
The alarm last night @ MI-12 was not the same as several years ago.
13
EE Support
Q847 Klixon repair/relocation. R:LAM52 investigation continues. May need to replace. (est. 2 hrs.)
14
Mechanical
Debuncher water leak reported. System on standby pump while work in progress. MC7 leaking LCW pump to be replaced.
15
Fluids
16
RF
Buss bar installation to be complete today or tomorrow. #17 ~ 1 hr. DT. #10 1 hr. DT.
17
MTA
Cavity testing continues.
18
Controls
Much effort with power outage recovery. Lost a couple of disk drives. BNB 204 chassis replaced. MI-10. Event $1F issue.
19
Instrumentation
Nothing to report.
20
FESS
Presention absent. (spot cooler @ MI-10) Thanks from Comm Ed for power outage & repair time.