Mon-Thurs Accelerator Scheduling Meeting
9 AM Meeting (03 Jul 2017)
==================
Linac
==================
  • Running well. 
  • Would still take oportunisitc time to look into KRF6. 
  • Studies request: Beam Energy/Linac Phase, 8 hours


==================
Booster
==================

  • Down BRF4
  • Returned for Laser notcher off.
    • Laser Notcher is being looked at now.
  • Studies Requests:
    • Beam profile monitor 2 hours: not today
    • GMPS 4 hours: Possibly after the Laser Notcher work is complete.
      • Don't suspect it will be 4 hours.


==================
Booster Neutrino
==================
Running well

==================
BNB Experiments
==================
Running well


==================
Main Injector & Recycler
==================
  • Recycler Damper amp has been problematic over the weekend. Looking at it today.
  • Looking into MIRF3 SSD 50V PS control trips
  • Studies requests:
    • Approved as schedule allows
      • RR injection loss vs. turns.
      • MI8 auto-tune. Mostly parasitic with occasional interupptions to beam.
      • $E3 end of cycle instability. Parasitic.
      • RR growth rate. Parasitic, uses $E0 events.
    • Waiting
      • RR injection loss vs. turns.
      • MI PS study (need more details)
      • MI short ramp. Parasitic.


==================
NuMI
==================
  • Looking into evaporator fan alarms
  • MI62 LCW leak rate has increased
  • Horn currnet scans completed.


==================
NuMI Experiments
==================
Running well

==================
Muon Rings
==================
  • Abort Septa confirmed bad, will replace during shutdown
  • M5 studies all weekend
  • AP0 air monitor was replaced Saturday.
  • Studies requests:
    • M1 loss studies, with 2.5 Mhz RF (preferred) and 53 Mhz. Both approved
    • 8 GeV studies. Also approved with coordination with experiment


==================
Muon Experiments
==================
Taking data

==================
SY120
==================
  • F:MC2H failed over the weekend. Tuned around. Being looked at today.
  • Checked pin hole collimator readbacks


==================
SY120 Experiments
==================
Taking data

==================
ES&H
==================
N/A

==================
EE Support
==================
Nothing to report

==================
Mechanical
==================
Nothing to report

==================
Fluids
==================
  • Added water to LRF4 & 5.
  • Investigating MI62 leak rate increase
  • MI Colum 1 is dying.


==================
RF
==================
  • Investigatin MIRF3 solid state dr.
  • Looking into RR 2.5 Mhz for Muon


==================
MTA
==================
  • Dry engine replacement underway. Estimate recovery late tonight.


==================
Controls
==================
Nothing to report


==================
Instrumentation
==================
Nothing to report

==================
FESS
==================
N/A


There are minutes attached to this event. Show them.
    • 1
      Crew Chief Operations Summary
      Slides
    • 2
      Linac
      • Running well. 
      • Would still take oportunisitc time to look into KRF6. 
      • Studies request: Beam Energy/Linac Phase, 8 hours
    • 3
      Booster

      • Down BRF4
      • Returned for Laser notcher off.
        • Laser Notcher is being looked at now.
      • Studies Requests:
        • Beam profile monitor 2 hours: not today
        • GMPS 4 hours: Possibly after the Laser Notcher work is complete.
          • Don't suspect it will be 4 hours.
    • 4
      Booster Neutrino
      Running well
    • 5
      BNB Experiments
      Running well
    • 6
      Main Injector & Recycler
      • Recycler Damper amp has been problematic over the weekend. Looking at it today.
      • Looking into MIRF3 SSD 50V PS control trips
      • Studies requests:
        • Approved as schedule allows
          • RR injection loss vs. turns.
          • MI8 auto-tune. Mostly parasitic with occasional interupptions to beam.
          • $E3 end of cycle instability. Parasitic.
          • RR growth rate. Parasitic, uses $E0 events.
        • Waiting
          • RR injection loss vs. turns.
          • MI PS study (need more details)
          • MI short ramp. Parasitic.
    • 7
      NuMI
      • Looking into evaporator fan alarms
      • MI62 LCW leak rate has increased
      • Horn currnet scans completed.
    • 8
      NuMI Experiments
      Running well
    • 9
      Muon Rings
      • Abort Septa confirmed bad, will replace during shutdown
      • M5 studies all weekend
      • AP0 air monitor was replaced Saturday.
      • Studies requests:
        • M1 loss studies, with 2.5 Mhz RF (preferred) and 53 Mhz. Both approved
        • 8 GeV studies. Also approved with coordination with experiment
    • 10
      Muon Experiments
      Taking data
    • 11
      SY120
      • F:MC2H failed over the weekend. Tuned around. Being looked at today.
      • Checked pin hole collimator readbacks
    • 12
      SY120 Experiments
      Taking data
    • 13
      ES&H
      N/A
    • 14
      EE Support
      Nothing to report
    • 15
      Mechanical
      Nothing to report
    • 16
      Fluids
      • Added water to LRF4 & 5.
      • Investigating MI62 leak rate increase
      • MI Colum 1 is dying.
    • 17
      RF
      • Investigatin MIRF3 solid state dr.
      • Looking into RR 2.5 Mhz for Muon
    • 18
      MTA
      • Dry engine replacement underway. Estimate recovery late tonight.
    • 19
      Controls
      Nothing to report
    • 20
      Instrumentation
      Nothing to report
    • 21
      FESS
      N/A
    • 22
      Miscellaneous