AD Weekly Friday - 2018 Scheduling Meeting/Weekly Summary

US/Central
Curia II (Wilson Hall)

Curia II

Wilson Hall

Description

Weekly Scheduling, Planning and Status 
Performance Plots
Meetings will be held on Monday, Wednesday, and Friday of each week.

AD Weekly Friday - 2018 Scheduling Meeting/Weekly Summary (02 Mar 2018)

Crew Chief→ see slide

Operations Coordinator→ Performance Plots

Linac→ See Slides

Booster→ see Slides. Studies request on $17 & $19 cycles.

Main Injector & Recycler→ See Slides. Pending shutdown later this month for kicker flourinert investigation/kicker removal.

NuMI→ First RAD trip understood, only one of two kickers fired. Second RAD trip *MAY* have been RF related.

NuMI Experiments→ Running well. Still some residual issues from last Sunday's power glitch.

Booster Neutrino→ Running well.

BNB Experiments→ LArIAT sump pit issue.

Muon Rings→ Optics study on Wednesday. Yesterday turned on beam line to experiment. Will look at bunch shape this morning.

Muon Experiments→ Tuesday & Wednesday made measurement of the absolute calibration probe with manet on. Pumping down since Tuesday. Started bring quads up on Wednesday. 85% of nominal @ 17Kv. No difference in spark rate in repaired quad vs. other quads.

SY120, Neutrino Muon, Meson Test, Meson Center→ Good week delivering beam to Mtest users. Ops has done a good job in responding to their requests. Monday Meson open. Tuesday & Thursday open in morning. Access into SY F1 & F2 on Monday. Confirmed beam to Mcenter. Collimator question; needing to be open more for rates. ORC's on Monday

SY120 Experiments→ See SY minutes.

FAST/IOTA→ IOTA water manifold installation continues. Skew quads have been terminated in the Cave and their power supplies are nearly complete. Field testing should begin in 2 weeks. The nonlinear insert is being prepped for a stretched wire test to locate the magnetic center of each element to within ±50 µm. TD and Alignment Group are performing the measurements and referencing the magnet. Assembly of the lambertson magnet has begun. Assembly of the octupole string should begin within the next 2 weeks.

PIP-II Injector Test→ no report

Alignment→ nothing to report

Controls→ nothing to report

Cryo→ RED compresser tripped yesterday on high discharge temperature. Ongoing issue. Brown compressor started and in recovery mode. CMTF frig cold. G-2 running well, new dry expander. NML warm, expander overhaul. HAB warm.

ESH&Q→ nothing to report

EE Support→ nothing to report

Instrumentation→ "I have nothing to report!"

Mechanical & Fluids→ Access into F1 enclosure on Monday. MS2 half barrel glycol water added. ArCO2 bottles changed.

RF→ Running well. Module to tighten RF gap tolerance.

FESS→ Site #39 xformer failure. No new, found one at rail head. (it faulted) Found another one holding so far. Flooding various areas. Linac ejector pump issue, bad check valve.

Summer Shutdown 2018→ See slides. New Electronic Worklist entry.

Miscellaneous→ Shutdown/access week of March 27th. Congrates to Sergei, welcome Mike Lindgren as division head.

MTA→ no report

 

There are minutes attached to this event. Show them.