9 AM Meeting (21 Mar 2018)
Crew Chief Operations Summary
•Monday
–MSEPTA, MBLM10, MBLM20 needed reboots. MSEPTA code reverted.
–Booster high field fallout issued solved.
–D:KPS5A tripped off and needed expert repair.
•Tuesday
–MC1 open access started 02:20.
–Mtest finished at 03:00.
–Booster studies.
–Beam off at 06:00.
–MI52 mini-loop interlocks dropped during access. Re-secured.
–Enclosure C interlocks dropped during gate repair. Re-secured.
–Beam to Linac at 13:30, rad trips during emittance scans.
•Wednesday
–06:30 keys issued for 8GeV line ion pump cables.
–Booster studies pending.
–Rebooted MBLM10 and MBLM20.
Linac
Marx upgrade LRF5. LRF5 water leak patch. Emittance scans. NIF (NTF) timing investigation.
Booster
Successful shutdown. Established beam to booster dump by 1600 yesterday. Thanks to all involved in work. Studies on evening shift. Turned off this morning for MI-8 access. Started booster studies @ 0845.
Booster Neutrino
Reference to beam spot motion that could be related to booster high field fallout. Tunnel work today. Possible beam this evening.
BNB Experiments
Work on DAQ.
Main Injector & Recycler
Going well. MI52 roughing overnight. Plan to have beam this evening. Reboot for RR & MI LLRF systems will be necessary. RAD suvey of tunnel completed. MI-8 ion pump cabling this morning.
NuMI
MW3 FE mentioned. Horn1 hanger valved out; leak appears to be gone (mostly). Seresco repare complete. Absorber Hall & Muon alcove will need secure.
NuMI Experiments
Took advantage of shutdown for various repairs.
Muon Rings
Made access into AP0 vault; vertical motor on target ground fault. (found wire in gears). Did leak chaecking, found small leak on ion pump feed thru. (vac sealed) Leak checking contiued. May ask operations to unlock supply(s).
Muon Experiments
Trolly run Monday evening. Used DT for maintence. Vacuum pump died, had spark started access early. May start a bit later this evening. Would like to go to 16 pulse operation over the weekend.
SY120
Gate between enc B & C fixed. H201 water leak discovered. (work in progress)
SY120 Experiments
Waiting for beam.
ES&H
Not to run BNB from 0600 to 1600. Statement about access requirements. PPE and such.
EE Support
Linac LRF2 Swap Marx cells; replace short studs Done
MI8 - Swap-in ramped correctors (10) Done
MI8 - MI8 access; fixed IP cables 835, 836, 838 Done
MI/RR
MI520 - Electrical support for kicker magnet removal Done
MI60S - Swap-in spare Hipot controller Done
MI60N I_PS60Q Swap-in re-hosed rectifier modules Done
MI60N I_PS60L Mitigate intermittent “in-ckt”; replace switch Done
MI60S I_PS60U Mitigate ISO amp offset (wye bridge) Done
MI14 R_LAM10 Swap-in repaired Magnapower switching PS Pending
MI40 R_LAM40 Repair indexing of LOC/REM switch (Dynapower) Pending
MI10-60N Service air filters, MIPS start panels Pending
MI14,30,52 Service air filters, Magna PSs Pending
Muon Campus
F27 D_Q709 Investigate PS transductor grounding issues In-progress
F27 D_Q707 Swap-out “now tested” Phase Control Module Done
AP0 D_H812 Install rebuilt cap bank Done
AP30 D_ICMAG PS studies (Dynapower output filter) Pending
AP30 D_ELAM Replace PS main contactor Done
AP50 D_IB Inspect substation for future switchgear upgrade Done
P1/P2/P3
F0 I_Q710 Swap-in upgraded gate drive cards Pending
F0 I_HV703 Replace leaking rectifier module In-progress
F0 - Replace control relay in (4) 500kW PSs Done
F1 I_F17B3 Swap-in repaired Magnapower switching PS Done
F2 - Isolate legacy PS switchgear Done
F4 S_HP3DS Restore oil level interlock Done
Other
T-Hall - TEL1 cable mitigation Pending
Mechanical
MSD Machine Reports (Mechanical/Vacuum/Fluids):
Proton Source (Kubinski):
MI/RR (Juarez):
Beamlines (Vrbos):
RF
RF 'A' & 'B' phase matched amps changed (120 Hz ripple found.) DI bottles replaced @ MI-60
Controls
Reference to splitting MW3 & MI60SB FE's from same crate. MSEPTA still an issue. Work in progress.
Instrumentation
Full report to be given Friday.
FESS
MECH
Casey's Pond- WCI cut out old Gas main, control wires traced, need to be identified for reconnection impact Andy's Pond and Swan Lake; All mechanical seals replaced. Both back in full operation, Valve Orientation incorrect! MINOS- Chiller Glycol Leak- Make -up Tank being monitored for Leak Rate Metasys DX Controller for Detector Hall/Nova CHE Loop replaced, Alarms programmed! WH 11E- Plumbing Release for cast iron Y replacement, may be related to "Brown Water" dripping at urinal on 10E M05 MESON BERM -INSTALL BELTS ON EXHAUST FAN MI10-20 30 40 50 52 60 -- 12"SINGLE BASKET MANUAL STRAINER FOR POND WATER -ANN APT30-REPAIR PIN HOLE LEAK IN SUMP DISCHARGE PIPING MI65 MEZZ- CLEAN CHW COILS ON AHU-2 AND VERIFY PROPER ELECTRIC HEAT OPERATION (requires heater removal) TEV RING A1-B4 TEST BY-PASS PUMP ROUTE today LARTF - CHECK & REPAIR A FAILED SUMP PUMP - replace piping to failed check valve MS3/F38W1/F38W2EXHAUST FAN, BELT DRIVE-ANN WHL - IR - LEAKING HP-10 SEAL - CREATE A MECHANICAL WORK ORDER WHLF07W - REPAIR WATER FOUNTAIN SPEWING WATER WHEN IT RUNS.