Oct 24 – 26, 2018
Fermilab
US/Central timezone

The LHCb Upstream Tracker upgrade and its off-detector electronics

Oct 26, 2018, 4:45 PM
10m
IARC (Fermilab)

IARC

Fermilab

Pine St and Kirk Rd Batavia, Illinois

Speaker

Mr Zishuo YANG (University of Maryland)

Description

The LHCb detector will operate with 40 MHz readout and full-software trigger at higher luminosity, after Phase-1 upgrade. The Upstream Tracker (UT) is a critical part of the upgrade that will increase the data rate and trigger efficiency. In this talk, I will describe the purpose and design of UT, with an emphasis on its off-detector electronics.

Presentation materials