Review of the Cryomodule Stand for PIP-II Linac. Review material can be found in TeamCenter (TC# ED0008410). FRS (TC: ED0007996) TRS (TC: ED0007997) Zoom Information: https://fnal.zoom.us/my/fggarcia
Review Charge
Review Report Template
    • 13:00 13:20
      Introduction 20m
      1. Team introduction and Organization 2. PIP-II Context 3. PIP2IT Context 4. Review Charge
      Speaker: Mr Curtis Baffes (Fermilab)
      Slides
    • 13:20 13:40
      Design Overview 20m
      1. Requirements 2. Configuration 3. Construction
      Speaker: Jesse Batko
      Slides
    • 13:40 14:20
      Analysis 40m
      1. Load Cases 2. Factor of Safety Summary
      Speaker: Jesse Batko
      Slides
    • 14:20 14:35
      Break 15m
    • 14:35 14:55
      Table-top Review of Drawings and CAD model 20m
      1. 2D Drawings available for investigation 2. 3D Model available for investigation
      Speaker: Scott Oplt (Fermilab)
      drawing - 25F000G
      drawing - F10107984
      drawings
      Slides
    • 14:55 15:30
      Installation Plan, ESHQ, Risk 35m
      1. QA Plan 2. Requirement verification 3. Installation Plan 4. Risk analysis 5. Failure modes and effects analysis 6. Safety by Design implementation
      Speakers: Mr Curtis Baffes (Fermilab), Jesse Batko
      FMEA
      Quality Plan and RVM
      Risk Assesment
      Safety by Design Assesment
      Slides
    • 15:30 15:45
      Programmatic Aspects 15m
      1. Schedule 2. Cost Estimation
      Speakers: Mr Curtis Baffes (Fermilab), Jesse Batko
      Slides
    • 15:45 16:00
      Closeout 15m
      1. Summary Statement 2. Preliminary Findings 3. Preliminary Comments 4. Preliminary Recommendations