This is the Requirements and Specification Review (RSR) for the PIP-II Cryo Plant Building

The PIP-II Project Design Review Plan (PIP-II-doc-1542) describes an RSR as:

A Requirements and Specification Review (RSR) is held to ensure alignment between the scientific goals and drivers, and technical requirements.

The review should address the following:

  • Project level requirements
  • System level requirements
  • Requirement margins
  • Operations requirements
  • Reliability requirements
  • Traceability to functional requirements
  • Requirements validation processes
Participants
  • Allan Rowe
  • Andrew Dalesandro
  • Barry Norris
  • Benjamin Hansen
  • Emil Huedem
  • Jay Theilacker
  • Randal Wielgos
    • 13:30 13:40
      Introductions
      Convener: Steven Dixon (Fermi National Accelerator Laboratory)
      slides
    • 13:40 14:00
      Cryo Plant Building Overview
      Convener: Steven Dixon (Fermi National Accelerator Laboratory)
      slides
    • 14:00 15:00
      Discussion
      Convener: Steven Dixon (Fermi National Accelerator Laboratory)
      drawings
    • 15:00 15:15
      Break
    • 15:15 15:50
      Recommendations
      Convener: Steven Dixon (Fermi National Accelerator Laboratory)
    • 15:50 16:00
      Close Out
      Convener: Steven Dixon (Fermi National Accelerator Laboratory)