PIP2IT FDR HEBT review

US/Central
AD/Loft (Fermilab)

AD/Loft

Fermilab

Phil Adamson (FNAL)
Description
Review of the HEBT design for PIP2IT. Review material can be found in TeamCenter (TC# ED0009237). * PIP2IT HEBT Technical Requirements Specification, TC# ED0008220 * Measurements to be conducted in the High Energy Beam Transport (HEBT) line of the * PIP-II Injector Test (PIP2IT), TC# ED0008280 * Producing Very Low-Particulate UHV Components, TC# ED0003571-B * Prototype Particle Safe Vacuum Cart Operation, TC# ED0000373-A * MEBT BPM EPDM, TC# ED0001310 * MEBT BPM FRS, TC# ED0001309/ED0003675 * Wire-scanner FRS, TC# ED0004340 * Slit/Slit emittance scanner FRS, TC# ED0008473 * TOF BPM FRS, TC# ED0004201 * Fast Faraday Cup FRS, TC# ED0004200 * HEBT Risk Analysis, TC# ED0008219 * HEBT assembly drawing number, TC#F10001768 Remote connection: https://fnal.zoom.us/j/798014067
Fast Faraday Cup - FRS
HEBT Agenda and Charge
HEBT - EPDM
HEBT - FRS
HEBT - HAR
HEBT - Measurement
HEBT - TRS
MEBT - BPM - FRS
Notes for HEBT Diagnostics TC:ED#0009237
Producing Very Low-Particulate UHV Components
Prototype Particle Safe Vacuum Cart Operation
Slit Emittance Scanner
TOF - BPM
Wire Scanner - FRS
    • 08:00 08:25
      I. Introduction 25m
      a. Introduction to PIP-II and PIP-II Injector Test (PIP2IT) b. Charge and Scope of the review i. Agenda for the review
      Speaker: Lionel Prost (Fermilab)
      Slides
    • 08:25 09:10
      II. HEBT beam line overview 45m
      a. PIP2IT in its final configuration b. HEBT specifications and scheme c. HEBT in operation d. Measurements intended to be carried out
      Speaker: Alexander Shemyakin (Fermilab)
      Slides
    • 09:10 09:20
      Coffee Break 10m
    • 09:20 09:50
      III. Vacuum design 30m
      a. Configuration b. MolFlow+ simulation c. Vacuum protection test results
      Speaker: Alex Chen (Fermilab)
      Slides
    • 09:50 10:20
      IV. Beam line mechanical design 30m
      a. Particle-free assembly and installation
      Speaker: Richard Andrews
      Slides
    • 10:20 10:40
      V. Plan for diagnostics 20m
      a. List of existing diagnostics that are intended to be used b. Performance at high-energy
      Speaker: Vic Scarpine (Fermilab)
      Slides
    • 10:40 11:00
      Committee Private Session 20m
      as-needed
    • 11:00 11:10
      VI. Closeout 10m
      a. Preliminary Findings, Comments & Recommendations
      Speaker: Dr Phil Adamson (FNAL)