This is the kick-off meeting for the external review of the PIP-II conventional facilities basis of estimate documents
Starts
Ends
US/Central
Fermilab - Wilson Hall
Gold Mine wh13se - Wilson Hall 13th fl South East
BoE Calculation Memos - Construction |
BoE Calculation Memos - EDIA |
Conceptual Drawings |
Functional Requirements Specifications |
Reference Documents |
Slides |
Technical Requirements Specification |
WBS 121.06.01 |
WBS 121.06.02 |
WBS 121.06.03 |
WBS 121.06.04 |
WBS 121.06.05 |
WBS 121.06.06 |
Charge Questions
For each Level 3 sub-system, please:
- Assess if the scope is necessary and sufficient to meet the objective KPP goals.
- Are the estimated resources, cost, and schedule reasonable and credible?
- Are the bases of estimates credible?
- Have uncertainties and risks been captured comprehensively?
- Please identify cost reduction opportunities
- Please identify Value Engineering opportunities.