Minutes of June 24 ArgonCube2x2 Installation Meeting
· Discussion mostly focused on scope and schedule of 2x2 installation in Minos
- information available in the slides posted in the indico page
· Detector configuration and location:
- 12 Minerva modules upstream, argonCube2x2 followed by 24 Minerva modules downstream.
- Default is to place the detector very downstream end and under the MINOS drip ceiling
· Desired to lower Minerva modules to match 2x2 TPC center
- Jim comment on that the installation tooling may not able to lower the Minerva module all the way down to floor
- It is likely we also need to raise the 2x2 cryostat. But there is a limitation how much we can do -- something like 0.5m is possible.
- Accessing top of Minerva modules and 2x2 cryostat top plate are essential requirements
- thinking of building simple bridge platform over Minos catwalks to access top of detector
· Jim and John located Minerva strongback and support stand. Need to work out space requirement for the storage support stand in upstream area of MINOS hall
· Steve comments there might be interface with MIGIS-100 experiment which is to use MINOS shaft for their setup
· Steve mentioned also there is a new dark photon experiment planned to use upstream area of MINOS hall
· Action items:
- Gary to compile MINOS hall 3d model and argonCube2x2 cryostat 3d model, then look height match and placement of the detectors
- Jim and John continue to collect Minerva/Minos tooling and installation procedures
- Steve to find out MIGIS setup in MINOS shaft and also their schedule for next Spring
- Please get an indico account if you do not have one. Indico is the platform we choose for exchange information
- Next meeting is July 8th