Information on precautionary site access restrictions to Fermilab's Batavia site in response to coronavirus/COVID-19
We continue to review all events currently planned for the next sixty days and organizers will be notified if their event must be canceled, postponed, or held remotely. Please, check back on Indico during this time for updates regarding your meeting specifics.
As DOE O 142.3A, Unclassified Foreign Visits and Assignments Program (FVA) applies not only to physical access to DOE sites, technologies, and equipment, but also information, all remote events hosted by Fermilab must comply with FVA requirements. This includes participant registration and agenda review. Please contact Melissa Ormond, FVA Manager, with any questions.

indico search will be reestablished in the next version upgrade of the software: https://getindico.io/roadmap/
For public events you may use either https://library.fnal.gov/indico-search/ or your browser's search engine: "your search string" site:indico.fnal.gov

PIP-II 650 MHz β=0.61 Jacketed Cavity Prototype Final Design Review

US/Central
Hermitage Conference Room, ICB 2nd floor east (Fermilab)

Hermitage Conference Room, ICB 2nd floor east

Fermilab

Description
UPDATE: ZOOM FOR DAY 2: 526-899-676 ZOOM LINK: https://fnal.zoom.us/j/526899676 Zoom Meeting ID: 703 251 375 Zoom link: https://fnal.zoom.us/j/703251375 Teamcenter number for review: ED0010864
LB650 FRS
LB650 TRS
PIP-II Technical Review Plan
Review charge
Review report template
  • Thursday, 7 November
    • 8:00 AM 8:15 AM
      Pre-review executive meeting (Review Committee Only) 15m
    • 8:15 AM 8:45 AM
      Introduction 30m
      Addresses Charges: 2.a, 2.b, 2.c, 2.d, 2.e
      Speaker: Dr Saravan Chandrasekaran (FNAL/TD)
      Introduction (updated)
      LB650 proto-FDR deliverables
      Relevant History
    • 8:45 AM 9:00 AM
      LB650 design overview 15m
      Addresses Charges: 1.a, 1.b, 1.c
      Speaker: Dr Grigory Eremeev (FNAL)
      Slides
    • 9:00 AM 9:30 AM
      LB650 Bare Cavity Design 30m
      Addresses Charges: 1.b, 3.a
      Speaker: Rocco Paparella (INFN Milano)
      Slides
    • 9:30 AM 9:45 AM
      LB650 Multipactoring simulations 15m
      Addresses Charges: 1.b, 3.a
      Speaker: Dr Gennady Romanov (Fermilab)
      Multipactoring simulations
    • 9:45 AM 9:55 AM
      Discussion 10m
    • 9:55 AM 10:10 AM
      Break 15m
    • 10:10 AM 10:25 AM
      LB650 Helium Vessel Engineering Design 15m
      a. Helium vessel and bellows engineering note b. Pressure vessel code compliance Addresses Charges: 1.b, 2.d, 3.a
      Speaker: Nitin Nigam
      Slides
    • 10:25 AM 10:55 AM
      LB650 Jacketed 3.75mm Cavity Design 30m
      Addresses Charges: 1.b, 2.d, 3.a
      Speaker: Sundeep Ghosh (VECC)
      Slides
    • 10:55 AM 11:15 AM
      LB650 Jacketed 4.15mm Cavity Design 20m
      Addresses Charges: 1.b, 2.d, 3.a
      Speaker: Mr Ivan Gonin (Fermilab)
      Slides
    • 11:15 AM 11:30 AM
      Discussion 15m
    • 11:30 AM 11:45 AM
      Cavity interfaces to other components 15m
      Addresses Charges: 1.c, 3.a
      Speaker: Mr Vincent Roger (FNAL/TD)
      Interfaces
    • 11:45 AM 12:30 PM
      Processing Plan for LB650 Cavities 45m
      Addresses Charges: 1.d, 3.a
      Speaker: Dr Martina Martinello (Fermilab)
      Slides
    • 12:30 PM 1:00 PM
      Discussion 30m
    • 1:00 PM 2:00 PM
      Lunch 1h
    • 2:00 PM 3:00 PM
      Discussion (If determined to be needed by Review Committee) 1h
    • 3:00 PM 3:30 PM
      Executive discussions (Review Committee only) 30m
  • Friday, 8 November
    • 8:00 AM 8:30 AM
      LB650 cavity jacketing and pressure testing 30m
      Addresses Charges: 1.d, 2.e, 3.a, 3.b
      Speaker: Chuck Grimm (Fermilab)
      Slides
    • 8:30 AM 9:00 AM
      Procurements 30m
      Addresses Charges: 1.e, 2.c, 2.e, 3.b
      Speaker: Dr Grigory Eremeev (FNAL)
      LB650 Nb Procurement
      Slides
    • 9:00 AM 9:30 AM
      Homework items update 30m
      LB650 proto Cavity Schedule
      TRS compliance
    • 9:30 AM 10:00 AM
      Discussions 30m
    • 10:00 AM 10:15 AM
      Break 15m
    • 10:15 AM 11:00 AM
      Executive discussions & Closeout preparation (Review Committee only) 45m
    • 11:00 AM 11:30 AM
      Closeout 30m
      Review report (draft)