PIP-II Linac Complex Requirements and Specifications Review

US/Central
AD/Bungalow - Linac North (Fermilab)

AD/Bungalow - Linac North

Fermilab

Steven Dixon (Fermi National Accelerator Laboratory)
Description

A Requirements and Specification Review (RSR) is held to ensure alignment between the overall scientific goals and functional and technical requirements including those imparted by interfacing systems.  RSRs are typically held in the conceptual or preliminary design phases at the time where requirements definitions mature sufficiently to proceed with formal design activities. 

The PIP-II Linac Complex includes the elements of work normally included in conventional construction such as earthwork, utilities, structural concrete, structural steel, architectural cladding, finishes, roofing, plumbing, process piping, heating ventilation and air conditioning (HVAC), fire protection, fire detection, lighting and electrical. 

The Linac Complex is comprised of the following components:

  1. The High Bay Building (HBB) includes the construction package including the below grade and above grade structures, mechanical, electrical, conveying systems and related support systems to house the Warm Front-End components and related infrastructure;
  2. The Linac Tunnel (LT) that includes the work required to install the below grade beamline enclosure to accommodate the beamline components and related support infrastructure;
  3. The Linac Gallery (LG) includes the above grade service building and associated infrastructure to support the technical equipment for the beamline components;
  4. The Beam Transfer Line (BTL) that includes the work required to install the below grade beamline enclosure from the downstream end of the LT to a point approximately 50 feet east of the existing Main Ring tunnel.  The BTL will accommodate the beamline components, beam absorber and related support infrastructure.
Charge
FRS
TRS (Draft)