11–14 Sep 2018
Argonne, Building 402
US/Central timezone

3-bit amplitude resolution, 40MHz-rate compatible and zero-suppressed readout integrated circuit for pixel detectors – FCP130 developed for the HL-LHC CMS Upgrade

14 Sep 2018, 11:15
30m
APS Conference Center (Argonne, Building 402)

APS Conference Center

Argonne, Building 402

Speaker

Farah Fahim (FERMILAB)

Presentation materials