E4R Test Facility Review

US/Central
One East (Fermilab)

One East

Fermilab

Wilson Hall, first floor
Description
Internal review of E4R Test Facility
Summary
    • 09:00 09:30
      Motivation, arrangement and goals of the HTS transmission line conductor test 30m
      Speaker: H. Piekarz
      Paper
      Slides
    • 09:30 09:45
      Magnet and power supply arrangement for the HTS conductor tests under a sweeping B-field 15m
      Speaker: S. Hays
      Paper
      Slides
    • 09:45 10:00
      Cryogenic system arrangement for the HTS conductor tests at E4R 15m
      Speaker: Y. Huang
      Paper
      Slides