T-980 Meeting - 2011 Plans, Pixel Noise Issues, QM status, 8 MS strip analysis
Wednesday, 16 February 2011 -
13:00
Monday, 14 February 2011
Tuesday, 15 February 2011
Wednesday, 16 February 2011
13:00
Plans for the rest of 2011
-
Dean Still
(Tevatron)
Plans for the rest of 2011
Dean Still
(Tevatron)
13:00 - 13:05
- Uncertain when Tev will stop running (March to Oct): - should plan to get now as much time as possible. March 7 shutdown: 1)Remove and reinstall E0 Vertical Goniometer. 2) Install F17 Pixel Detector. 3) Remove and reinstall OR fix in place E0 Pixel detector. Priorities: - Find channel for QM. (After - Commission Pixel both planes. - Channel QM and O shape through pixel get profile of channeled beam. - Demonstrate 2 plane crystal collimation.
13:05
E0 Pixel Noise Issues and Solutions
-
Ryan Rivera
E0 Pixel Noise Issues and Solutions
Ryan Rivera
13:05 - 13:30
- E0 Pixel has Beam Induced Noise: - Explanation of problem. - Possible solutions. -Changes Needed to of F17 Pixel before Installation:
13:30
Status to of QM-01-10
-
Viktoriya Zvoda
(AD/Tevatron)
Dean Still
(Tevatron)
Status to of QM-01-10
Viktoriya Zvoda
(AD/Tevatron)
Dean Still
(Tevatron)
13:30 - 13:45
13:45
Analysis of IHEP 8 strip strip MS-08-09
-
Dean Still
(Tevatron)
Dick Carrigan
Analysis of IHEP 8 strip strip MS-08-09
Dean Still
(Tevatron)
Dick Carrigan
13:45 - 14:00