T-980 Meeting

US/Central
    • 1
      Plans for 2 weeks of studies
      Priorities: - Find channeled or VR beam on pixel. - Scan and study both MS-8 and MS-16. - Demonstrate 2 plane crystal collimation. - Use 2 plane crystal collimation for collider store.
      Speaker: Mr Dean Still (Tevatron)
    • 2
      Pixel data and status
      Speaker: Mr Dean Still (Tevatron)
      Slides
    • 3
      Reasons QM did not Channel
      Speaker: Mr Dean Still (Tevatron)