650 MHz cavities and crymodules
Tuesday, 31 May 2011 -
07:30
Monday, 30 May 2011
Tuesday, 31 May 2011
07:30
CM design, including 48" vacuum vessel
-
Yuriy and Tom
CM design, including 48" vacuum vessel
Yuriy and Tom
07:30 - 07:45
07:45
Warm-up / cool-down manifold pipe elevation
-
Tom
Warm-up / cool-down manifold pipe elevation
Tom
07:45 - 07:55
07:55
1.3 GHz 1-cell cavities to swap
1.3 GHz 1-cell cavities to swap
07:55 - 08:10
08:10
650 MHz 5-cell fabrication plans
-
Mike
650 MHz 5-cell fabrication plans
Mike
08:10 - 08:20
08:20
Update on 650 MHz 1-cells from JLab
-
Camille
Update on 650 MHz 1-cells from JLab
Camille
08:20 - 08:30
08:30
AOB
AOB
08:30 - 08:35