Introduction stating the purpose, the format, timeline, roles and responsibilities, summarize progress since PDR.
Brief description of the state of the SRFCryo L3 system designs.
Description of current cryomodule 2K circuit designs.
Current design status of the CDS relieving systems.
Fast cooldown constraints and requirements of the current cryomodule designs, including flow rates, cooldown cycle numbers, pressure drops, and shield delta Ts.
Discussion of the capacity upgrade for the cryoplant, valving configurations for the CDS, and piping sizes.
Discussion of Significant Interfaces between SRFCryo Systems.
RF Coupler and Superconducting magnet lead cooling air flow requirements is a driving force for the PIP-II conventional air system.
Discussion of the current plan for cryomodule bayonet layouts and CDS bayonet can design.
Description of the CDS Controls interfaces to Cryomodules, including planned controlled and non-controlled systems.