Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.

10–14 Sep 2012
Fermi National Accelerator Laboratory
US/Central timezone

Design of control network and survey for the CSNS

11 Sep 2012, 13:50
25m
1 West (Wilson Hall)

1 West

Wilson Hall

Paper Survey & Alignment of Beamline and Machine Components Survey & Alignment of Beamline and Machine Components

Speaker

Mr tong wang (Institute of High Energy Physics, Chinese Academy of Sciences)

Description

China Spallation Neutron Source(CSNS) mainly consists of an H- linac about 197m in length, a proton rapid cycling synchrotron(RCS) about 228m in circumference, the linac to RCS beam transport (LRBT) about 40m in length, and the RCS to target transport(RTBT) about 144m in length. It is designed to accelerate proton beam pulses striking a solid metal target to produce spallation neutrons. The construction of CSNS is in progress. The overall arrangement of the control network is presented. The control network of CSNS is classified into two types: the primary network and the secondary network. The primary network is used for the layout of buildings and devices and to provide high accuracy control for the secondary network which offers a reference for installing, locating and adjusting the accelerator devices. The instruments and the methods of the horizontal and vertical measurements are also described.

Primary author

Mr tong wang (Institute of High Energy Physics, Chinese Academy of Sciences)

Presentation materials