Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.

10–14 Sep 2012
Fermi National Accelerator Laboratory
US/Central timezone

HLS Installation at KEKB Main Ring after the Great East Japan Earthquake

11 Sep 2012, 14:45
5m
1 West (Wilson Hall)

1 West

Wilson Hall

Poster Poster Presentations Poster Presentations (5 minutes per poster)

Speaker

Mr Takashi Kawamoto (KEK)

Description

Thirteen Hydrostatic Leveling Sensors (HLS) were installed in the south arc section of the KEKB main ring after the Great East Japan Earthquake. The KEKB tunnel consists of four arc sections connected by four straight sections. It has been observed that the south arc is very sensitive to activities above ground, such as loading and unloading in the truck yard above the tunnel. The tunnel motion observed by the HLS will be reported.

Primary author

Co-authors

Presentation materials