We will have the DUNE General computing meeting:
https://fnal.zoom.us/j/336647590
Meeting ID: 336 647 590
standard computing password, will be sent by email for those who don't know it.
One tap mobile
+16699006833,,336647590# US (San Jose)
+16465588656,,336647590# US (New York)
Dial by your location
+1 669 900 6833 US (San Jose)
+1 646 558 8656 US (New York)
Meeting ID: 336 647 590
Find your local number: https://fnal.zoom.us/u/adJsct1aBR
Andrew McNab on the benchmarking project
OSU students show their monitoring results from a project with Steve Timm tracking Rucio transfers.
Sites, networking, and central DUNE computing services (GlideinWMS, SAM, RUCIO, CRIC, ETF, Databases).
Also from operations
BNL working on submit node to join DUNE global pool
May move BERN (UNIBE-LHEP) to DUNE global pool to get around dune/microboone ambiguity
on the DN.
Will close Manchester ticket because this is problem on DUNE data ops slide.
Welcome Amit Bashyal @ANL
TIFR/India has new network switch.
Request in for 6GeV MC with the revised pdspprod4A software base, similar to the 1GeV MC that was
recently redone.
Meeting was had between Ken/Elisabetta and the vertical drift task force leaders Dominque/Alessandro
a vertical drift geometry is understood and they are working to make a 10-event sample
We will meet with the APA consortia folks on Wednesday to discuss updating the interface document to include something brief on the hardware DB, basically to point out they're responsible for putting things in it.
We're also following up with the PartsID DB developer to make sure he gets useful feedback on the interface, currently it's mainly a GUI and could use a REST API to allow easy bulk updates.
(This item should probably be split into smaller units?)
From Mathew,
I have a conflict at 10 am today. ND update is that we’re preparing for an ND round of production. This week groups are working to finalize their geometries, the e-dep sim configuration and, production scripts. We are documenting code locations (and centralizing where possible). We hope that by the end of this week we can have initial instructions of all the group from our primary samples (GENIE LAr +GAr, and Genie LAr + TMS) so that production can give a sample run a try and we can see what’s broken. We have a ND software meeting this Wednesday.
SAM, RUCIO etc
HEPCloud, GlideinWMS, POMS, etc. https://github.com/DUNE/dist-comp/labels/WMSdev
ETF site monitoring, perfSonar network monitoring
It would be great to have:
https://dune.github.io/computing-training/setup.html