DUNE CE WIB call

US/Central
    • 15:00 15:30
      CRYO WIB/ICEBERG Updates 30m
      Speakers: Mark Convery, Patrick Tsang (SLAC), Shekhar Mishra (Fermilab)
    • 15:30 15:50
      Timing Endpoint and WIB Synchronization 20m
      Speakers: Mr Adrian Nikolica (University of Pennsylvania), Alexander Madorsky (University of Florida)

      Minutes from Alex:

      WIB Test stand in UF

      • WIB test stand in UF is being restored
      • Thaihang Chung (our summer student) is working on this
      • Timing master firmware and software installed and working
      • Working on WIB software installation now
        • Thanks to Adrian and Ben for detailed instructions!

      Firmware management

      • Support for multiple chips is immediately available in Vivado
      • multiple chip targets can be set up within one project
      • Did not know, even though used Vivado since 2014
      • Discovered by accident, mucking around with another project
      • GIT Repository updated, have a single project now, with ZU6 and ZU9 targets
      • Still might want to look at firmware management systems, to handle graphical designs better
      • Signed up for HOG tutorial on June 15th

      Ongoing development:

      • COLDATA internal time stamp reset from timing command = 0 (timestamp)
      • Everything is ready for it in current firmware, just need to program a register 
      • Will test when UF test stand is operational