LBNE Far Site Internal Conceptual Design, Cost, Schedule and Risk Review

US/Central
Fermilab

Fermilab

Description
<style type="text/css">@font-face {
  font-family: "Cambria Math";
}@font-face {
  font-family: "Calibri";
}p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0in 0in 0.0001pt; font-size: 11pt; font-family: Calibri; }.MsoChpDefault { font-size: 11pt; font-family: Calibri; }div.WordSection1 { page: WordSection1; }</style>Assess the status and adequacy of the conceptual design for LBNE Water Cherenkov Detector (WCD), Liquid Argon Detector (LAr), and the associated Conventional Facilities (CF) at the Far Site (Sanford Lab).  This review is to identify areas of weakness, and to recommend actions necessary to bring these elements to the level required for a successful DOE CD-1 review, currently planned for spring 2012.  In addition, this review will assess the cost and schedule status of each subproject. 

Further information and background documentation can be accessed from the review web page.
For assistance please contact : Sonya Wright