LBNE Near Site Cost and Schedule Review

US/Central
Fermilab

Fermilab

Description
<style type="text/css"> @font-face { font-family: "Calibri"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0in 0in 0.0001pt; font-size: 11pt; font-family: Calibri; }.MsoChpDefault { font-size: 11pt; font-family: Calibri; }div.WordSection1 { page: WordSection1; }</style> Assess the status and adequacy of the cost and schedule based on the conceptual design for LBNE Beamline, Near Detector, and the associated Conventional Facilities (CF) at the Near Site (Fermilab).  This review is to identify areas of weakness, and to recommend actions necessary to bring these elements to the level required for a successful DOE CD-1 review, currently planned for spring 2012.

Further information and background documentation can be accessed from the review web page.