Upstream DAQ Tech meeting

US/Central

 

Current sprint

Towards dunedaq-2.10.0

  • TP firmware
    • Tests done with new tag dtp-firmware 1.2.0 (inc axis 32 b support at input/output + ipbus 1.10.0)
    • Phase 2 FLX integration
      • KM has included FIFOs at inputs to CR (required for dtp output)
      • TE added a block at input which splits data between CR and DTP, which reads data into 2 separate FIFOs, to handle separate outputs gracefully. Simulation seems OK. Next add wibulator output for hardware tests.
      • Test phase 2 FLX with dummy pod before slotting in DTP block.
      • Will need new tags for dtp-firmware (1.3.0), and felix-pie (2.0.0)
  • TP Software
    • Old/new TP formats supported + stitching + trigger
    • Work needed to separate FW/SW dependencies + changes to link handler
    • Then benchmark using old/new formats + choose format
  • SNB buffer
    • May push changes after evaluation of SW TP + SNB recording measurements on Cascade Lake

 

Future plans

  • Timing
    • Hardware : verify ipBus working on MIB in uTCA crate. Then port Timing FW, demonstrate clock distro etc. Goal is working.
    • Software : some work needed to support MIB (target 2.12.0 ?).  RC integration.
      • Action : arrange meeting on RC (Stoyan, Roland, Alessandro, Florian).
  • Readout FW
    • MRs needed for : half-rate links, link scrambling
  • Readout SW
    • RC integration.
    • Need to prepare a new version for CentOS8 (and mainline 5.13)
    • Ethernet readout. dpdk.  Dedicated meeting needed.
  • Trigger primitives
    • Configuration
      • Erdem has made some progress.
      • Lives in shadow
    • WIB2 support for data Rx
      • In progress.
      • Will not require SW update (we think)
      • Standalone release, just adding WIB2 support.
  • Integration status
    • CERN NP : setup hardware for CB-VD, TLU for Timing. CB-HD next.
      • https://docs.google.com/spreadsheets/d/1bsnlsszfXwNB1DaFwFpp12C3DXOrPdeaqSblNWqrpI0/edit?usp=sharing
    • CERN DT-DI lab : testing with Cascade Lake, pushing limits.
    • Bristol : no update, but available for tests.
      • Would be good to setup dual boot system for CentOS8 support, if possible.
    • UPenn : no updates
    • ICEBERG : facility has been on generator for ~week, experiencing brownouts.  Server has rebooted. FLX might be sensitive to this ?

 

AOB

none

 