Upstream DAQ Tech meeting

Europe/Zurich
    • 14:00 14:10
      Current sprint 10m

      dunedaq-2.8.2
      - updates to readout for new data formats
      - timing opmon issues ?

      dunedaq-2.10.0
      - TPG integration
      - Consolidation & refactoring
      - SNB writer update

      Stretch goals :
      - RC integration
      - Ethernet readout

      Speakers: Jim Brooke, Roland Sipos (CERN)

      Current sprints

      • dunedaq-2.8.2
        • nobody had anything to report
      • dunedaq-2.10.0
        • TP integration
          • Timing issues with a register related to ZCU102 ?  Fixed by hand.
          • Successful FELIX build (1 link/SLR) that meets timing. But locks up after 1 sec, now debugging
          • Goal for 2.10 is for working readout (no crashes etc) in dunedaq with TP inclusive FW
          • Problems in SW when we have 3 TP hits in a frame. Related to default destructor, investigating.
        • SNB write (zero copy) and refactoring.
        • Ethernet readout
          • Roland & Florian to allocate some time in the near future for this.

       

      Integration

      • CERN NP
        • Timing and readout is working nicely for both CBs
      • Bristol
        • Recording data in 2.8.0 in Bristol lab working as basis for validation tools
        • Xilinx U50 on order for testing ethernet readout with TPs
          • Also need 100Gb NIC - any suggestions for the card?

       

      Round table

      • Timing
        • MIB will commission ipBus control over front panel, then backplane
        • Then move onto test with bugfixed daughterboard
        • Planning when/how we will introduce uTCA crate (+MIB+FIB) at CERN NP, in early 2022.
        • Still outstanding FW tasks (GPS, redundancy)
        • Software on track.  Outstanding task is RC integration (JB will organise meeting).
      • Readout FW
        • nothing to report
      • Readout SW
        • nothing to report
      • TP FW
        • WIB2 : broken dependencies in data reception fixed (KM), testing underway (KK). Once this is tested will move on to testing the new repacker, and then whole data router testing.
        • Config : found some bugs in simulation, and fixed them. Only working with 1 link for now, will try multiple links next.  Then integrate into ZCU102 project to examine resource use.
      • TP SW
        • Stitching algorithm implemented (IH), needs validation. Might make 2.10 but if not, can be factorised and released later.
        • KK working on validation tools.  Need to decide in which repo this code belongs.

       

    • 14:10 14:20
      Integration 10m

      Integration status and upcoming tasks at:
      - Neutrino Platform
      - CERN DT-DI lab
      - Bristol
      - UPenn
      - ICEBERG

      Speakers: Jim Brooke, Roland Sipos (CERN)
    • 14:20 14:59
      Round table 39m

      Looking beyond the current sprint, at planned development, upcoming issues/challenges etc.

      • Timing 5m

        Hardware
        SW packages : timing, timinglib

        Speakers: David Cussans (University of Bristol), Stoyan Trilov
      • Readout FW 5m

        firmware : FELIX core

        Speaker: Filiberto Bonini (Brookhaven National Laboratory)
      • Readout SW 5m

        packages : readout, flxlib

        Speakers: Ivana Hristova (STFC RAL), Roland Sipos (CERN), Shyam Bhuller (University of Bristol)
      • Trigger Primitive FW 5m

        packages : felix-pie, dtp-firmware

        Speakers: Antony Earle (University of Sussex), Konstantinos Manolopoulos (Rutherford Appleton Laboratory), Kunal Kothekar
      • Trigger Primitive SW 5m

        packages : readout (TPG), dtp-control, dtp-simulation

        Speakers: Ivana Hristova (STFC RAL), Jim Brooke, Kunal Kothekar
    • 14:59 15:00
      AOB 1m