MSD Machine Operations Report Summary Wednesday, December 7, 2022 Proton Source 1. Mechanical/Vacuum a. Leak checking in Booster today b. Providing support for swapping Preacc source 2. Fluids a. Nothing to report Main Injector/Recycler 1. Mechanical/Vacuum a. Retrieving cable from MI30 alcove during today's access 2. Fluids a. Nothing to report External Beamlines 1. Mechanical/Vacuum a. Meson - F1 Manhole i. Waiting on ion pump tee weldment ii. Ready for alignment of beam pipe today 2. Fluids a. MS2 LCW i. Controls personnel determined the motor current trip limits in the PLC are set lower than what the motors are drawing - will increase the trip limits ii. Waiting to turn on pumps until FESS available to take voltage, current, and temperature readings of the starters inside the MCC while each of the pumps is running b. NS2 DI Loop i. Finished installing the pressure test setup ii. Will be doing a preliminary leak check at 20 psig, likely today iii. After inspection of the setup, will notify the DSO and do the test Fluids – General 1. NML - investigating and troubleshooting a differential pressure switch on a Klystron Collector which randomly trips off every few days 2. MC7 - filling Jolly green magnet and valving it into MS-6 LCW system today