MSD Machine Operations Report Summary Monday, December 19, 2022 Proton Source 1. Mechanical/Vacuum a. Booster i. Moving spare RF cavity from MI60 to staging area this morning ii. Will plan to leak check area around IPRF21 Wednesday b. Linac - Tank 5 vacuum alarming above 2E-7 Torr i. Requesting opportunity to leak check 2. Fluids a. Nothing to report Main Injector/Recycler 1. Mechanical/Vacuum a. I:IP901D tripped off – Ops reset and turned on b. I:IP816 tripped off – is still off (problem appears to be in the cable, bullet, or HV connector – the supply checked out okay last week) 2. Fluids a. Nothing to report External Beamlines 1. Mechanical/Vacuum a. Meson - F1 Manhole vacuum stable 2. Fluids a. NS2 DI loop i. Passed hydro test Friday ii. Today finish installing the relief valve and check the filters to make sure they don't need new cartridges iii. Then will valve in the DI loop b. If time permits, will stop-by Muon AP-50 and amp the compressor in the chiller today c. F-2 - set up back up compressor and put in work order for ISD to check no power on house compressor Fluids – General 1. MP7 - air compressor failed and replacing it this week