MSD Machine Operations Report Summary Wednesday, December 21, 2022 Proton Source 1. Mechanical/Vacuum a. Linac - leak checking Tank 5 today b. Booster - replacing BRF15 and leak checking around IPRF21 today 2. Fluids a. Nothing to report Main Injector/Recycler 1. Mechanical/Vacuum a. 8 GeV - EE support replaced the end of the I:IP816 cable at the power supply and vacuum looks good now 2. Fluids a. Nothing to report External Beamlines 1. Mechanical/Vacuum a. Mu2e EM filter installation today 2. Fluids a. NS2 DI loop getting valved in this morning b. Muon AP50 chiller work later today i. Turn chiller on, run for a few cycles, then turn skid on c. REM system high temp alarm yesterday i. It was found in a low-speed mode and FESS changed this mode to high-speed ii. Temperatures started coming down after this Fluids – General 1. NML-FAST - will fill expansion tank before holiday weekend 2. MP7 - replacing air compressor head on cryo system