MSD Machine Operations Report Summary Monday, March 6, 2023 Proton Source 1. Mechanical/Vacuum a. Tank 5 vacuum in Linac is at 1.00E-6 i. Ready for turbo pump installation 2. Fluids a. Nothing to report Main Injector/Recycler 1. Mechanical/Vacuum a. I:IG521 tripped off on Saturday and reset fine b. Submitting a request to search the MVA and MI alcoves for Recycler sextuple stands for summer installation 2. Fluids a. Filled the Magnet system expansion tank to 57 inches on Friday and it's down to 44 inches today i. Will have to fill again today to keep up with the leak External Beamlines 1. Mechanical/Vacuum a. NM2 i. Replacement SWIC located and should be ready this week ii. Getting update on alignment as-found status iii. Preparing addition of gate valve to beamline 2. Fluids a. NS2 DI loop work planned to begin tomorrow and expect 2 day duration Fluids – General 1. NML- IOTA - Blew out 3 magnets for removal of top coils in Iota ring 2. CMTF - tomorrow Affiliated Services comes onsite to fix leaky glycol pumps inside Aaon chiller unit