MSD Machine Operations Report Summary Friday, April 28, 2023 Proton Source 1. Mechanical/Vacuum a. Nothing to report 2. Fluids a. Nothing to report Main Injector/Recycler 1. Mechanical/Vacuum a. R:IP901D had a nuisance trip on 4/26, around 22:30 b. During yesterday’s access: i. I:IP400B HV connector was replaced. The pump is on and running well. ii. I:IP301A investigation completed and 1 of 2 pumps is running 2. Fluids a. Orange hoses were replaced Wednesday b. Gathered the needed information from the Abort Room LCW RAW skid External Beamlines 1. Mechanical/Vacuum a. Nothing to report 2. Fluids a. May add water to REM system from F2 if not regenerating CUB column II today b. Filling MI62 LCW today Fluids – General 1. CUB a. Column 3 on line to REM System at 18 Mohms b. Column 2 needs regeneration c. Column 1 used for Main Injector magnet system fill today after MI62 tank filled