Please read these instructions before posting any event on Fermilab Indico

Indico will be down for a brief server restart on Friday Jan 24th at 5PM CST. The downtime will be 15min at most.

DUNE 2x2 Installation

US/Central

Ting Miao (FNAL)
    • 11:00 11:20
      Status and progress reports 20m
    • 11:20 11:40
      MPOD DC power cable fabrication and routing in MINOS hall 20m
      Speaker: Matt Micheli
    • 11:40 12:00
      DC power control 20m
      Speaker: Thomas Murphy