Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method will be removed on Tuesday, Feb 4th at 5PM CST. See news for more details.

4–6 Dec 2012
Fermilab
US/Central timezone

Mechanics:

Not scheduled
20m
Black Hole (Fermilab)

Black Hole

Fermilab

Description

a. Pressure vessel b. Copper liner c. Energy plane mechanics d. Energy plane, cables, and feed-through design e. Field cage & insulator f. HV feed-through g. EL planes h. Tracking plane mechanics i. Tracking plane, cables, and feed-through design

Primary author

Presentation materials

There are no materials yet.