Installation option 3 – Secondary crane used with cameras and dagger system, including potential guiding systems
Installation option 4 – Custom cantilevered fixture with main crane and remote disconnect
Personnel Access options – Range of options for installation and maintenance
Summary – Closing thoughts and suggestions for follow-up/closeout meeting
Speakers:
Arvydas Vasonis
(fess),
Linda Valerio
(Fermilab),
Martin Murphy
(Fermilab AD Operations),
Noah Curfman,
Ty Funk