Connected: Adam, Ivana, Emanuele, Dario, Wes, Sophie, Roland
Adam:
-- working on gantt chart for TPG activity
-- News: meeting with Francesco Pietropaolo on TPs for PD2. Two main points: 1) check the constants used in the AbsRS 2) mitigations for overflow conditions (e.g. charge) by splitting TPs
Ivana:
-- Working on PR for validation code. Making the changes after Adam's review
-- Working on regression testing code (80% done). Soon to have a PR
Dario:
-- prepared the PR for the event display. Adam will have a look today
Emanuele:
-- PR for the automatic PDF reporting of the TP quality
-- PR for the plotting of the TP properties by plane
-- expect PRs to be ready by the end of next week
Sophie:
-- will make a monitoring run over the weekend to check stability of the TP sw. Check with Wes how to run the system
Wes, Roland and Adam:
-- in-depth review of the gantt chart in view of detector operations